BMP | Construction cost converted to 2010 💲 USEPA (1999) per ft3 of treated water volume | Construction cost converted to 2010 💲 per ft3 of treated water volume | C = Cost(💲) (2003)
X = size of watershed(acre) |
---|---|---|---|
Constructed Wetlands | 0.80-1.70 | 0.20-2.40 | C = 3,852X0.484 |
Wet Detention Basins | 0.70-1.40 | 0.30-3.70 | C = 13,909X0.672 |
Infiltration Trenches | 5.40 | 6.50-11.50 | Not reported |
Bioretention Basins | 7.20 | 10.10-11.30 | C = 10,162X1.088 |
Infiltration Basins | 1.80 | Not reported | Not reported |
Dry Ponds | 0.70-1.40 | 0.30-5.00 | Not reported |
Sand Filters | 4.10-8.20 | 3.40-16.80 | C = 47,888X0.882 |