Navigation
Main page
Table of contents
Index (Categories)
What's new
Response to comments
Future updates
Events
In the News
Funding
Recent changes
Help
Export to pdf
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MPCA Links
MPCA Homepage
Stormwater
Policies / Disclaimers
Minnesota Stormwater Manual
Search Help
Log in
Search:
Search
Minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more)
Revision as of 20:28, 20 February 2013 by
Mtrojan
(
talk
|
contribs
)
(
diff
)
← Older revision
|
Latest revision
(
diff
) |
Newer revision →
(
diff
)
Stormwater pollutant concentrations and event mean concentrations
>
Survey of street sweeping crediting approaches
>
Erosion prevention practices - Riprap
>
Construction stormwater practices - diversion and working in the dry
>
Minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more)
This table shows minimum setback requirements (for bioretention practices that treat a volume of 1000 gallons or more)
Link to this
table
Setback from
Minimum Distance (feet)
Property Line
10
Building Foundation - Minimum with slopes directed away from the building.
10
Private Well
50
Public Water Supply Well
50
Septic System Tank/Leach Field
50
Category
:
Table
Search:
Search
Privacy policy