Navigation
Main page
Table of contents
Index (Categories)
What's new
Response to comments
Future updates
Events
In the News
Funding
Recent changes
Help
Export to pdf
Tools
What links here
Related changes
Special pages
Permanent link
Page information
MPCA Links
MPCA Homepage
Stormwater
Policies / Disclaimers
Minnesota Stormwater Manual
Search Help
Log in
Search:
Search
2020 MS4 General Permit
Revision as of 15:35, 3 December 2020 by
Rheck
(
talk
|
contribs
)
(
diff
)
← Older revision
|
Latest revision
(
diff
) |
Newer revision →
(
diff
)
2020 MS4 General Permit
This site is currently undergoing revision. For more information, open this
link
.
We are in the process of populating this page with the 2020 MS4 General Permit
Table of Contents
Section 1 Eligibility
Section 2 Authorized Stormwater Discharges
Section 3 Authorized Non-Stormwater Discharges
Section 4 Limitations on Authorization
Section 5 Permit Authorization
Section 6 Transfer of Ownership or Control
Section 7 Issuance of Individual Permits
Section 8 Rights and Responsibilities
Section 9 Application for Reissuance
Section 10 New Permittee Applicants
Section 11 Existing Permittee Applicants
Section 12 Stormwater Pollution Prevention Program (SWPPP) Document
Section 13 Stormwater Pollution Prevention Program (SWPPP) .
Section 14 Mapping
Section 15 Minimum Control Measures (MCMs)
Section 16 MCM 1: Public Education and Outreach
Section 17 MCM 2: Public Participation/Involvement
Section 18 MCM 3: Illicit Discharge Detection and Elimination
Section 19 MCM 4: Construction Site Stormwater Runoff Control
Section 20 MCM 5: Post-Construction Stormwater Management.
Section 21 MCM 6: Pollution Prevention/Good Housekeeping For Municipal Operations
Section 22 Discharges to Impaired Waters with a USEPA-Approved TMDL that includes an Applicable WLA
Section 23 Alum or Ferric Chloride Phosphorus Treatment Systems
Section 24 Stormwater Pollution Prevention Program (SWPPP) Modification
Section 25 Annual Assessment, Annual Reporting, and Recordkeeping
Section 26 General Conditions
Section 27 Definitions
Appendix A: Alum or Ferric Chloride Phosphorus Treatment Systems
Appendix B: Schedules
Search:
Search
Privacy policy