Bioretention - construction inspection checklist.
Link to this table
Outlets installed pre plans
Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Construction Sequence |
Satisfactory / Unsatisfactory |
Comments |
1. Pre-Construction |
Pre-construction meeting |
|
|
Runoff diverted |
|
|
Facility area cleared |
|
|
Soil tested for permeability |
|
|
Project benchmark near site |
|
|
Facility location staked out |
|
|
Temporary erosion and sediment control established |
|
|
2. Excavation |
Lateral slopes completely level |
|
|
Soils not compacted during excavation |
|
|
Longitudinal slopes within design range |
|
|
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence |
|
|
3. Structural Components |
Stone diaphragm installed per plans |
|
|
|
|
Underdrain installed to grade |
|
|
Pretreatment devices installed per plans |
|
|
Soil bed composition and texture conforms to specifications |
|
|
4. Vegetation |
Complies with planting specs |
|
|
Topsoil complies with specs in composition and placement |
|
|
Soil properly stabilized for permanent erosion control |
|
|
5. Final Inspection |
Dimensions per plans |
|
|
Pre-treatment operational |
|
|
Inlet/outlet operational |
|
|
Soil/ filter bed permeability verified |
|
|
Effective stand of vegetation stabilized |
|
|
Construction generated sediments removed |
|
|
Contributing watershed stabilized before flow is diverted to the practice |
|
|
Comments:
|
Actions to be taken:
|