Infiltration basin - system construction inspection checklist.
Link to this table
<tdProject benchmark established
Project: |
Location: |
Site Status: |
Date: |
Time: |
Inspector: |
Construction Sequence |
Satisfactory / Unsatisfactory |
Comments |
1. Pre-Construction |
Pre-construction meeting |
|
|
Runoff diverted |
|
|
Soil permeability verified |
|
|
SGroundwater / bedrock verified |
|
|
|
|
Facility location staked out |
|
|
Temporary erosion and sediment control establishedd |
|
|
2. Excavation |
Size and location per planse |
|
|
Side slopes stable |
|
|
Depth adjusted to soil layer with specified soil type and permeabilityn |
|
|
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence |
|
|
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence |
|
|
3. Embankment |
Anti-seep collar or filter diaphragm per plans |
|
|
Fill material per specifications |
|
|
4. Final Excavation |
Drainage area stabilizeds |
|
|
Sediment removed from facility |
|
|
Basin floor tilled |
|
|
Facility stabilized |
|
|
Removable cap / footplate per plans |
|
|
Initial depth = feet |
|
|
5. Final Inspection |
Pre-treatment facility operational |
|
|
Contributing watershed stabilized prior to flow diversion |
|
|
Inlet and outlet operationall |
|
|
Comments:
|
Actions to be taken:
|