Construction specifications for stormwater wetlands
Revision as of 18:43, 14 December 2012 by Chochstein(talk | contribs)(Created page with "CADD-based details for pond and wetland systems are contained in Appendix D. The following details, with specifications, have been created for stormwater ponds/wetlands: * Ty...")
CADD-based details for pond and wetland systems are contained in Appendix D. The following details, with specifications, have been created for stormwater ponds/wetlands:
Typical Pond Plan and Profile
Shallow Wetland Plan and Profile
Extended Detention Shallow Wetland Plan and Profile