Peak discharge (cfs) during a wet year (2002)
Link to this table
Design rainfall event | Pre-development | 1-yr 24-hr Instantaneous volume | 1-yr 24-hr routed (R124) | Development 2-yr 24-hr peak Instantaneous volume | Development 2-yr 24-hr peak routed (R224) |
---|---|---|---|---|---|
2002 | 14.4 | 6.72 | 19.8 | 6.5 | 16.3 |
Peak discharge (cfs) during a wet year (2002)
This page was last edited on 6 August 2022, at 22:10.