m
 
(14 intermediate revisions by 2 users not shown)
Line 2: Line 2:
  
 
<imagemap>
 
<imagemap>
Image:MPCA_Small_Site_Graphic.JPG|Image map test
+
Image:Updated MPCA_Small_Site_Graphic.JPG|Image map test
circle 58 152 15 [[Protection of existing trees on construction sites]]
+
circle 55 152 15 [[Protection of existing trees on construction sites]]
circle 58 292 15 [[Stormwater infiltration|infiltration page]]
+
circle 55 291 15 [[Construction stormwater best management practice - stockpile management]]
circle 58 378 15 [[Stormwater infiltration|infiltration page]]
+
circle 55 378 15 [[Construction stormwater best management practice - construction materials management requirements|Construction materials management]]
circle 58 447 15 [[Stormwater infiltration|infiltration page]]
+
circle 55 447 15 [[Construction stormwater best management practice - construction materials management requirements|Construction materials management]]
circle 58 564 15 [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Perimeter_controls_for_disturbed_areas Sediment control BMPs are required on all downgradient perimeters of your site]
+
circle 55 564 15 [[Sediment control practices - Perimeter controls for disturbed areas]]
circle 58 714 15 [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Storm_drain_inlet_protection Inlet protection BMPs are required for any inlets that will receive runoff from the project site]
+
circle 55 714 15 [[Sediment control practices - Storm drain inlet protection]]
circle 58 813 15 [[Construction stormwater best management practice – Concrete, paint, stucco and other washout guidance]]
+
circle 55 813 15 [[Construction stormwater best management practice – Concrete, paint, stucco and other washout guidance]]
circle 386 817 15 [[Sediment control practices - Vehicle tracking BMPs]]
+
circle 383 817 15 [[Sediment control practices - Vehicle tracking BMPs]]
circle 391 527 18 [[Protection of existing trees on construction sites]]
+
circle 388 527 18 [[Protection of existing trees on construction sites]]
circle 398 635 18 [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Storm_drain_inlet_protection]
+
circle 395 634 18 [[Sediment control practices - Storm drain inlet protection]]
circle 548 580 18 [[Construction stormwater best management practice – Concrete, paint, stucco and other washout guidance]]
+
circle 545 579 18 [[Construction stormwater best management practice – Concrete, paint, stucco and other washout guidance]]
circle 627 434 18 [[Stormwater infiltration|infiltration page]]
+
circle 624 433 18 [[Construction stormwater best management practice - construction materials management requirements|Construction materials management]]
circle 670 754 18 [[Sediment control practices - Vehicle tracking BMPs]]
+
circle 667 753 18 [[Sediment control practices - Vehicle tracking BMPs]]
circle 788 677 18 [[Construction stormwater best management practice – Stormwater Pollution Prevention Plan]]
+
circle 784 677 18 [[Construction stormwater best management practice – Stormwater Pollution Prevention Plan]]
circle 875 832 15 [https://stormwater.pca.state.mn.us/index.php?title=Sediment_control_practices_-_Perimeter_controls_for_disturbed_areas]
+
circle 838 805 15 [[Sediment control practices - Perimeter controls for disturbed areas]]
circle 943 358 18 [[Stormwater infiltration|infiltration page]]
+
circle 939 358 18 [[Construction stormwater best management practice - construction materials management requirements|Construction materials management]]
circle 1008 422 18 [[Stormwater infiltration|infiltration page]]
+
circle 1004 421 18 [[Construction stormwater best management practice - stockpile management|Stockpile Management]]
circle 1038 661 15 [[Protection of existing trees on construction sites]]
+
circle 1035 660 15 [[Protection of existing trees on construction sites]]
circle 1113 137 15 [[Construction stormwater best management practice – Stormwater Pollution Prevention Plan]]
+
circle 1110 136 15 [[Construction stormwater best management practice – Stormwater Pollution Prevention Plan]]
circle 1186 558 15 [[Construction stormwater best management practice – Site stabilization]]
+
circle 1182 557 15 [[Construction stormwater best management practice – Site stabilization]]
circle 1135 712 15 [[Construction stormwater best management practice – Site stabilization]]
+
circle 1132 711 15 [[Construction stormwater best management practice – Site stabilization]]
circle 1302 451 18 [[Protection of existing trees on construction sites]]
+
circle 1297 450 18 [[Protection of existing trees on construction sites]]
rect 452 170 510 185 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content#5.24 The SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not required where the function of a specific area dictates compaction.]
+
rect 449 170 507 185 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content#5.24 The SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not required where the function of a specific area dictates compaction.]
rect 412 328 462 343 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on constructed base components of roads, parking lots and similar surfaces. Stabilization is not required on temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) but must provide sediment controls at the base of the stockpile.]
+
rect 409 327 459 342 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on certain temporary stockpiles but must provide sediment controls at the base of the stockpile.]
rect 313 399 371 414 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.2 Permittees must place building products and landscape materials under cover (e.g., plastic sheeting or temporary roofs) or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not required to cover or protect products which are either not a source of contamination to stormwater or are designed to be exposed to stormwater.]
+
rect 310 397 368 412 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.2 Permittees must place building products and landscape materials under cover (e.g., plastic sheeting or temporary roofs) or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not required to cover or protect products which are either not a source of contamination to stormwater or are designed to be exposed to stormwater.]
rect 110 515 168 530 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.5 Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035.]
+
rect 107 514 165 529 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.5 Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035.]
rect 249 665 299 680 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.2 Permittees must establish sediment control BMPs on all downgradient perimeters of the site and downgradient areas of the site that drain to any surface water, including curb and gutter systems. Permittees must locate sediment control practices upgradient of any buffer zones. Permittees must install sediment control practices before any upgradient land-disturbing activities begin and must keep the sediment control practices in place until they establish permanent cover.]
+
rect 258 665 308 680 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.2 Permittees must establish sediment control BMPs on all downgradient perimeters of the site and downgradient areas of the site that drain to any surface water, including curb and gutter systems. Permittees must locate sediment control practices upgradient of any buffer zones. Permittees must install sediment control practices before any upgradient land-disturbing activities begin and must keep the sediment control practices in place until they establish permanent cover.]
rect 228 765 278 780 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.7 Permittees must protect all storm drain inlets using appropriate BMPs during construction until they establish permanent cover on all areas with potential for discharging to the inlet.]
+
rect 243 765 293 780 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.7 Permittees must protect all storm drain inlets using appropriate BMPs during construction until they establish permanent cover on all areas with potential for discharging to the inlet.]
rect 42 883 101 897 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.9 Permittees must provide effective containment for all liquid and solid wastes generated by washout operations (e.g., concrete, stucco, paint, form release oils, curing compounds and other construction materials) related to the construction activity. Permittees must prevent liquid and solid washout wastes from contacting the ground and must design the containment so it does not result in runoff from the washout operations or areas. Permittees must properly dispose liquid and solid wastes in compliance with MPCA rules. Permittees must install a sign indicating the location of the washout facility.]
+
rect 39 882 98 896 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.9 Permittees must provide effective containment for all liquid and solid wastes generated by washout operations related to the construction activity. Permittees must prevent liquid and solid washout wastes from contacting the ground and must design the containment so it does not result in runoff from the washout operations or areas. ermittees must properly dispose liquid and solid wastes in compliance with MPCA rules. Permittees must install a sign indicating the location of the washout facility.]
rect 484 900 543 914 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.11 Permittees must install a vehicle tracking BMP to minimize the track out of sediment from the construction site or onto paved roads within the site.]
+
rect 447 900 506 914 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_9_Sediment_Control_Practices#9.11 Permittees must install a vehicle tracking BMP to minimize the track out of sediment from the construction site or onto paved roads within the site.]
rect 1136 221 1191 236 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_20_SWPPP_Availability Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.]
+
rect 1254 237 1309 252 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_20_SWPPP_Availability Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.]
rect 1218 799 1268 814 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on constructed base components of roads, parking lots and similar surfaces. Stabilization is not required on temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) but must provide sediment controls at the base of the stockpile.]
+
rect 1218 797 1268 812 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on constructed base components of roads, parking lots and similar surfaces.]
rect 1212 863 1271 878 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.9 Permittees must immediately initiate stabilization of exposed soil areas, as described in item 8.4, and complete the stabilization within seven (7) calendar days after the construction activity in that portion of the site temporarily or permanently ceases.]
+
rect 1209 863 1268 878 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters#23.9 Permittees must immediately initiate stabilization of exposed soil areas, as described in item 8.4, and complete the stabilization within seven (7) calendar days after the construction activity in that portion of the site temporarily or permanently ceases.]
 
</imagemap>
 
</imagemap>
 +
 +
<noinclude>
 +
[[Category:Level 2 - Best management practices/Construction practices]]
 +
[[Category:Level 3 - Best management practices/Nonstructural practices/Pollution prevention]]
 +
</noinclude>

Latest revision as of 13:26, 17 January 2023

Click on a number in the image to link to a page with more information on the topic.

Protection of existing trees on construction sitesConstruction stormwater best management practice - stockpile managementConstruction materials managementConstruction materials managementSediment control practices - Perimeter controls for disturbed areasSediment control practices - Storm drain inlet protectionConstruction stormwater best management practice – Concrete, paint, stucco and other washout guidanceSediment control practices - Vehicle tracking BMPsProtection of existing trees on construction sitesSediment control practices - Storm drain inlet protectionConstruction stormwater best management practice – Concrete, paint, stucco and other washout guidanceConstruction materials managementSediment control practices - Vehicle tracking BMPsConstruction stormwater best management practice – Stormwater Pollution Prevention PlanSediment control practices - Perimeter controls for disturbed areasConstruction materials managementStockpile ManagementProtection of existing trees on construction sitesConstruction stormwater best management practice – Stormwater Pollution Prevention PlanConstruction stormwater best management practice – Site stabilizationConstruction stormwater best management practice – Site stabilizationProtection of existing trees on construction sitesThe SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not required where the function of a specific area dictates compaction.Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on certain temporary stockpiles but must provide sediment controls at the base of the stockpile.Permittees must place building products and landscape materials under cover (e.g., plastic sheeting or temporary roofs) or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not required to cover or protect products which are either not a source of contamination to stormwater or are designed to be exposed to stormwater.Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035.Permittees must establish sediment control BMPs on all downgradient perimeters of the site and downgradient areas of the site that drain to any surface water, including curb and gutter systems. Permittees must locate sediment control practices upgradient of any buffer zones. Permittees must install sediment control practices before any upgradient land-disturbing activities begin and must keep the sediment control practices in place until they establish permanent cover.Permittees must protect all storm drain inlets using appropriate BMPs during construction until they establish permanent cover on all areas with potential for discharging to the inlet.Permittees must provide effective containment for all liquid and solid wastes generated by washout operations related to the construction activity. Permittees must prevent liquid and solid washout wastes from contacting the ground and must design the containment so it does not result in runoff from the washout operations or areas. ermittees must properly dispose liquid and solid wastes in compliance with MPCA rules. Permittees must install a sign indicating the location of the washout facility.Permittees must install a vehicle tracking BMP to minimize the track out of sediment from the construction site or onto paved roads within the site.Permittees must keep the SWPPP, including all changes to it, and inspections and maintenance records at the site during normal working hours by permittees who have operational control of that portion of the site.Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased. Stabilization is not required on constructed base components of roads, parking lots and similar surfaces.Permittees must immediately initiate stabilization of exposed soil areas, as described in item 8.4, and complete the stabilization within seven (7) calendar days after the construction activity in that portion of the site temporarily or permanently ceases.Image map test
About this image

This page was last edited on 17 January 2023, at 13:26.