Line 26: | Line 26: | ||
circle 1302 451 18 [[Protection of existing trees on construction sites]] | circle 1302 451 18 [[Protection of existing trees on construction sites]] | ||
rect 452 170 510 185 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content#5.24 The SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not required where the function of a specific area dictates compaction.] | rect 452 170 510 185 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_5_Stormwater_Pollution_Prevention_Plan_(SWPPP)_Content#5.24 The SWPPP must describe methods to minimize soil compaction and preserve topsoil. Minimizing soil compaction is not required where the function of a specific area dictates compaction.] | ||
− | rect 412 328 462 343 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased | + | rect 412 328 462 343 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_8_Erosion_Prevention_Practices#8.4 Permittees must stabilize all exposed soil areas, including stockpiles. Stabilization must be initiated immediately to limit soil erosion when construction activity has permanently or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Stabilization must be completed no later than 14 calendar days after the construction activity has ceased.] |
rect 313 399 371 414 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.2 Permittees must place building products and landscape materials under cover (e.g., plastic sheeting or temporary roofs) or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not required to cover or protect products which are either not a source of contamination to stormwater or are designed to be exposed to stormwater.] | rect 313 399 371 414 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.2 Permittees must place building products and landscape materials under cover (e.g., plastic sheeting or temporary roofs) or protect them by similarly effective means designed to minimize contact with stormwater. Permittees are not required to cover or protect products which are either not a source of contamination to stormwater or are designed to be exposed to stormwater.] | ||
rect 110 515 168 530 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.5 Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035.] | rect 110 515 168 530 [https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_12_Pollution_Prevention_Management_Measures#12.5 Permittees must properly store, collect and dispose solid waste in compliance with Minn. R. ch. 7035.] |