m
 
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{alert|This section of the manual is being developed|alert-under-construction}}
+
{{alert|This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.|alert-danger}}
 +
{{alert|This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the [https://www.pca.state.mn.us/business-with-us/construction-stormwater construction stormwater website] for the most up-to-date information.|alert-under-construction}}
  
This page displays the table of contents and links to Sections of the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM  
+
This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.
  
Link to the 2018 Minnesota Construction Stormwater Permit - pdf version
+
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf 2023 Minnesota Construction Stormwater Permit - PDF]
  
 
==Table of Contents==
 
==Table of Contents==
===*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_1_Permit_Coverage Section 1 Permit Coverage]===
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_1_Permit_Coverage Section 1 Permit Coverage]
===*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_2_Prohibitions_and_Limitations_of_Coverage Section 2 Prohibitions and Limitations of Coverage]===
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_2_Prohibitions_and_Limitations_of_Coverage Section 2 Prohibitions and Limitations of Coverage]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_3_Application_and_Coverage_Effective_Date Section 3 Application and Coverage Effective Date]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_3_Application_and_Coverage_Effective_Date Section 3 Application and Coverage Effective Date]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_4_Termination_of_Coverage Section 4 Termination of Coverage]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_4_Termination_of_Coverage Section 4 Termination of Coverage]
Line 31: Line 32:
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_24_General_Provisions Section 24 General Provisions]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_24_General_Provisions Section 24 General Provisions]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions Section 25 Definitions]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions Section 25 Definitions]
 +
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 20:56, 2 August 2023

Warning: This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.
This site is currently undergoing revision. For more information, open this link.
This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the construction stormwater website for the most up-to-date information.

This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.

Table of Contents

This page was last edited on 2 August 2023, at 20:56.