m
 
(18 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{alert|This section of the manual is being developed|alert-under-construction}}
+
{{alert|This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.|alert-danger}}
 +
{{alert|This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the [https://www.pca.state.mn.us/business-with-us/construction-stormwater construction stormwater website] for the most up-to-date information.|alert-under-construction}}
  
This page displays the table of contents and links to Sections of the 2018 Minnesota Construction Stormwater permit.
+
This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.
 +
 
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm2-81a.pdf 2023 Minnesota Construction Stormwater Permit - PDF]
  
 
==Table of Contents==
 
==Table of Contents==
Line 24: Line 27:
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_19_Regional_Wet_Sedimentation_Basins Section 19 Regional Wet Sedimentation Basins]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_19_Regional_Wet_Sedimentation_Basins Section 19 Regional Wet Sedimentation Basins]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_20_SWPPP_Availability Section 20 SWPPP Availability]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_20_SWPPP_Availability Section 20 SWPPP Availability]
*[ Section 21 Training Requirements]
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_21_Training_Requirements Section 21 Training Requirements]
*[ Section 22 Requirements for Discharges to Wetlands]
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_22_Requirements_for_Discharges_to_Wetlands Section 22 Requirements for Discharges to Wetlands]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters Section 23 Discharges to Special (Prohibited, Restricted, Other) and Impaired Waters]  
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_23_Discharges_to_Special_(Prohibited,_Restricted,_Other)_and_Impaired_Waters Section 23 Discharges to Special (Prohibited, Restricted, Other) and Impaired Waters]  
*[ Section 24 General Provisions]]
+
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_24_General_Provisions Section 24 General Provisions]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions Section 25 Definitions]
 
*[https://stormwater.pca.state.mn.us/index.php?title=MN_CSW_Permit_Section_25_Definitions Section 25 Definitions]
 +
 +
<noinclude>
 +
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 +
</noinclude>

Latest revision as of 20:56, 2 August 2023

Warning: This permit is no longer in use. Ongoing projects have 18 months (until Feb. 1st, 2025) to finish the project OR update their SWPPP to comply with new requirements. Permittees are not required to follow changes to the permanent stormwater treatment section of the next permit.
This site is currently undergoing revision. For more information, open this link.
This page will be updated to show the Construction Stormwater Permit that was reissued August 1st, 2023. Some information may no longer be accurate. Consult the construction stormwater website for the most up-to-date information.

This page displays guidance on the table of contents and Sections of the 2023 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM.

Table of Contents

This page was last edited on 2 August 2023, at 20:56.