m
m
Line 33: Line 33:
  
 
<noinclude>
 
<noinclude>
[[Category:2018 Construction Stormwater General Permit]]
+
[[Category:Level 2 - Regulatory/Construction (CSW)]]
 
</noinclude>
 
</noinclude>

Revision as of 19:09, 17 November 2022

Warning: This page and the Sections below are considered a guidance document to the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM and is not considered the official permit. A copy of the official permit and coverage letter will be emailed once the permit application has been completed and submitted to the MPCA.

This page displays guidance on the table of contents and Sections of the 2018 MINNESOTA GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM

Table of Contents