Line 1: Line 1:
=='''Table 3:<br/>New Permittees - Schedule of permit requirements'''==
+
==Appendix B. Schedules==
 +
==='''Table 3:<br/>New Permittees - Schedule of permit requirements'''===
 
{| class="wikitable" style = "background: transparent;"
 
{| class="wikitable" style = "background: transparent;"
 
|-
 
|-
Line 5: Line 6:
 
|-
 
|-
 
| '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document'''  
 
| '''Section 12. Stormwater Pollution Prevention Program (SWPPP)<br/>Document'''  
*<i>Submit the SWPPP Document completed in accordance withn<i/><br/>Section 12
+
*<i>Submit the SWPPP Document completed in accordance withn<br/>Section 12<i/>
 
|style= "vertical-align:bottom"|
 
|style= "vertical-align:bottom"|
 
*Within 150 days after General Permit issuance<br/>date.
 
*Within 150 days after General Permit issuance<br/>date.
 
|-
 
|-
| '''Section 13. Stormwater Pollution Prevention Program (SWPPP)'''  
+
|style= "vertical-align:top"| '''Section 13. Stormwater Pollution Prevention Program (SWPPP)'''  
*<i>Complete revisions to incorporate the new requirements of<i/><br/>Sections 14 - 23 into current SWPPP.  
+
*<i>Complete revisions to incorporate the new requirements of<br/>Sections 14 - 23 into current SWPPP.<i/>
 
|style= "vertical-align:bottom"|
 
|style= "vertical-align:bottom"|
*Within 150 days after General Permit issuance<br/>date.
+
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below.
 
|-
 
|-
| Example || Example
+
| style= "vertical-align:top"| '''Section 19. Construction Site Stormwater Runoff Control'''
 +
*<i>Complete revisions to Construction Site Stormwater Runoff<br/>Control program, including revisions to regulatory mechanism(s),><br/>if necessary<i/>
 +
*<i>When the CSW Permit is reissued, revise regulatory<br/>mechanism(s), if necessary, to be at least as stringent as the<br/>requirements for erosion, sediment, and waste controls described<br/>in the CSW Permit.<i/>
 +
|style= "vertical-align:bottom"|
 +
*Within 12 months of the date General Permit<br/>coverage is extended, unless other timelines have<br/>been specifically established in the General Permit<br/>and identified below.
 
|-
 
|-
 
| Example || Example
 
| Example || Example

Revision as of 16:00, 8 December 2020

Appendix B. Schedules

Table 3:
New Permittees - Schedule of permit requirements

Permit requirement Schedule
Section 12. Stormwater Pollution Prevention Program (SWPPP)
Document
  • Submit the SWPPP Document completed in accordance withn
    Section 12
  • Within 150 days after General Permit issuance
    date.
Section 13. Stormwater Pollution Prevention Program (SWPPP)
  • Complete revisions to incorporate the new requirements of
    Sections 14 - 23 into current SWPPP.
  • Within 12 months of the date General Permit
    coverage is extended, unless other timelines have
    been specifically established in the General Permit
    and identified below.
Section 19. Construction Site Stormwater Runoff Control
  • Complete revisions to Construction Site Stormwater Runoff
    Control program, including revisions to regulatory mechanism(s),>
    if necessary
  • When the CSW Permit is reissued, revise regulatory
    mechanism(s), if necessary, to be at least as stringent as the
    requirements for erosion, sediment, and waste controls described
    in the CSW Permit.
  • Within 12 months of the date General Permit
    coverage is extended, unless other timelines have
    been specifically established in the General Permit
    and identified below.
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example
Example Example