Line 5: Line 5:
 
</big>
 
</big>
 
===11.2===  
 
===11.2===  
<big> All <span title="An owner/operator of a small MS4 that has been authorized to discharge stormwater under a previously issued general permit for small MS4s in the state of Minnesota.">'''existing permittees'''</span> seeking to continue discharging <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> associated with a small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] after the issuance date of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit] must submit Part 2 of the permit application : Due by 150 days after permit issuance. Existing permittees were required to submit Part 1 of the permit application prior to the expiration date (July 31, 2018) of the Agency's [https://stormwater.pca.state.mn.us/index.php?title=2013_MS4_General_Permit small MS4 general permit No.MNR040000], effective August 1, 2013. [[https://www.revisor.mn.gov/rules/7090.1010/ Minn. R. 7090.1010]]</big>
+
<big> All <span title="An owner/operator of a small MS4 that has been authorized to discharge stormwater under a previously issued general permit for small MS4s in the state of Minnesota.">'''existing permittees'''</span> seeking to continue discharging <span title="Stormwater runoff, snow melt runoff, and surface runoff and drainage.">'''stormwater'''</span> associated with a small [https://stormwater.pca.state.mn.us/index.php?title=What_is_a_municipal_separate_storm_sewer_system_(MS4)%3F MS4] after the issuance date of the [https://www.pca.state.mn.us/sites/default/files/wq-strm4-94.pdf General Permit] must submit [https://www.pca.state.mn.us/water/2020-ms4-general-permit Part 2 of the permit application] :Due by 150 days after permit issuance. Existing permittees were required to submit Part 1 of the permit application prior to the expiration date (July 31, 2018) of the Agency's [https://stormwater.pca.state.mn.us/index.php?title=2013_MS4_General_Permit small MS4 general permit No.MNR040000], effective August 1, 2013. [[https://www.revisor.mn.gov/rules/7090.1010/ Minn. R. 7090.1010]]</big>

Revision as of 17:46, 5 March 2021

Section 11 Existing Permittee Applicants

11.1

Existing Permittee Applicants. [Minn. R. 7090]

11.2

All existing permittees seeking to continue discharging stormwater associated with a small MS4 after the issuance date of the General Permit must submit Part 2 of the permit application :Due by 150 days after permit issuance. Existing permittees were required to submit Part 1 of the permit application prior to the expiration date (July 31, 2018) of the Agency's small MS4 general permit No.MNR040000, effective August 1, 2013. [Minn. R. 7090.1010]