==Introduction==
 
==Introduction==
Line 24: Line 26:
 
*[[media:Wq-strm4-90.pdf|Timeframes listed in the Construction Stormwater Permit]] - MPCA's document containing all of the time frame considerations that are detailed in the [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction stormwater permit Construction Stormwater Permit]
 
*[[media:Wq-strm4-90.pdf|Timeframes listed in the Construction Stormwater Permit]] - MPCA's document containing all of the time frame considerations that are detailed in the [https://stormwater.pca.state.mn.us/index.php?title=2018_Minnesota_Construction_Stormwater_Permit Construction stormwater permit Construction Stormwater Permit]
 
*[[media: Construction-Stormwater-Permit-Small Lot.pdf|10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]] - MPCA's factsheet on the 10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites.
 
*[[media: Construction-Stormwater-Permit-Small Lot.pdf|10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites]] - MPCA's factsheet on the 10 Steps to Stormwater Pollution Prevention on Small Residential Construction Sites.
 +
*[https://www.pca.state.mn.us/sites/default/files/wq-strm4-98.docx "Model" MCM 4 and MCM 5 regulatory mechanism guidance (wq-strm4-98)]
  
 
===Documentation and tracking templates===
 
===Documentation and tracking templates===
Line 64: Line 67:
 
*[[media:RCWD_&_Centerville_MS4_MCM_4_Pilot_Partnership.docx|MCM 4 Pilot Agreement]] - Word version of pilot agreement between Rice Creek Watershed District and the City of Centerville for MCM 4
 
*[[media:RCWD_&_Centerville_MS4_MCM_4_Pilot_Partnership.docx|MCM 4 Pilot Agreement]] - Word version of pilot agreement between Rice Creek Watershed District and the City of Centerville for MCM 4
  
==MCM 4: Construction site stormwater runoff==
+
==Construction site stormwater runoff==
 
The information in this section provides MS4 permittees with tools they can use to meet MCM 4, which addresses construction site stormwater runoff.
 
The information in this section provides MS4 permittees with tools they can use to meet MCM 4, which addresses construction site stormwater runoff.
 
*[[:Training programs and print materials for Minimum Control Measure (MCM) 4]]
 
*[[:Training programs and print materials for Minimum Control Measure (MCM) 4]]
 
[[Category:Level 3 - Regulatory/Municipal (MS4)/Guidance, outreach materials, miscellaneous information]]
 

Latest revision as of 16:21, 7 May 2024

Warning: This page is an edit and testing page use by the wiki authors. It is not a content page for the Manual. Information on this page may not be accurate and should not be used as guidance in managing stormwater.
Construction site adjacent to water body

Introduction

Controlling sediment and other pollutants from construction sites is crucial to an effective stormwater management program. Minimum Control Measure (MCM) 4 of the MS4 General Permit requires permittees to have and enforce a construction site stormwater runoff control program to reduce the impacts of land disturbing activities to stormwater.

MS4 General Permit requirements for MCM 4

The construction site stormwater runoff control program must include:

  • A regulatory mechanism that establishes erosion, sediment, and waste controls as stringent as the Construction Stormwater permit requirements for construction sites.
  • A site plan review procedure for conducting site plan reviews to ensure compliance with the construction stormwater runoff control regulatory mechanism.
  • Written procedures for the receipt and consideration of reports of noncomplaince at construction sites received from the public.
  • Construction site inspection procedures for inspecting public and private construction sites. The procedures should include: procedures for identifying and prioritizing sites for inspections, the frequency of site inspections, the name or title of the person responsible for inspections, and a checklist or other written means to document site inspections.
  • Enforcement response procedures to compel compliance with the construction stormwater runoff control regulatory mechanism.
  • Documentation as described here.

Resources

Click on the blue links above in the "MS4 General Permit requirements" section to get more information and resources specific to those permit requirements. In addition, all resources related to MCM 4 are below.

Fact sheets and guidance documents

Fact sheets and guidance documents should provide background information and tips to inform your approach to implementing MCM 4 - Construction Site Stormwater Control.

Documentation and tracking templates

Documentation and tracking templates are examples that local stormwater staff are currently using to meet the MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Checklists

Below are methods that local stormwater staff are currently using to meet the site inspection and site plan review documentation Construction Site Stormwater Runoff Control requirements in the MS4 General Permit for MCM 4 - Construction Site Stormwater Control.

Example Procedures

Example procedures are those that local stormwater staff are currently using to meet the Construction Site Stormwater Runoff Control MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Model language

Fill in the blanks and adopt ordinance language that meets the regulatory mechanism requirements for MS4 General Permit requirements for MCM 4 - Construction Site Stormwater Control.

Other

Miscellaneous materials local stormwater staff are using.

  • Construction site good housekeeping reminder - City of Red Wing's tool to remind construction site owners/operators to maintain sites in compliance with their construction site stormwater runoff control regulatory mechanism
  • Construction site good housekeeping acknowledgement - City of Red Wing's tool to acknowledge and appreciate sites that are in compliance with their construction site stormwater runoff control regulatory mechanism
  • Notice of violation - City of Rice Lake's notice of violation
  • Buffer reminder - City of Hutchinson's reminder to maintain a vegetative buffer at the water's edge
  • Contractor training - City of Big Lake's training for contractors conducting construction projects within the city
  • MCM 4 Pilot Agreement - PDF version of pilot agreement between Rice Creek Watershed District and the City of Centerville for MCM 4
  • MCM 4 Pilot Agreement - Word version of pilot agreement between Rice Creek Watershed District and the City of Centerville for MCM 4

Construction site stormwater runoff

The information in this section provides MS4 permittees with tools they can use to meet MCM 4, which addresses construction site stormwater runoff.