m
m
Line 15: Line 15:
 
<td>StormTech Isolator Row</td>
 
<td>StormTech Isolator Row</td>
 
<td>Residential, Urban, Commercial</td>
 
<td>Residential, Urban, Commercial</td>
<td>StormTech detention/ infiltration arc storage chambers</td>
+
<td>StormTech detention/ infiltration arc storage chambers [https://www.swbmp.vwrrc.vt.edu/wp-content/uploads/2017/10/Filter_Application_StormTech-Isolator-Row_Item-1.pdf]</td>
 
<td>Yes</td>
 
<td>Yes</td>
<td>Volume-based for sites with good infiltrative soils, or more commonly rate-based using a water quality flow <= 2.5 gpm/sq ft of bottom area using two layers of woven geotextile, see Table 2. See design tool from manufacturer (does not require registration).</td>
+
<td>Volume-based for sites with good infiltrative soils, or more commonly rate-based using a water quality flow <= 2.5 gpm/sq ft of bottom area using two layers of woven geotextile, see [https://www.swbmp.vwrrc.vt.edu/wp-content/uploads/2017/10/Filter_Application_StormTech-Isolator-Row_Item-1.pdf Table 2]. [https://designtool.stormtech.com/RegionSelect.html See design tool] from manufacturer (does not require registration). [https://www.stormtech.com/download_files/pdf/manual_iso_row.pdf]</td>
 
<td></td>
 
<td></td>
 
<td>Manhole with overflow weir before pretreatment row</td>
 
<td>Manhole with overflow weir before pretreatment row</td>
Line 23: Line 23:
 
<tr>
 
<tr>
 
<td>Settling chamber/vault </td>
 
<td>Settling chamber/vault </td>
<td>Urban, Construction, Agricultural</td>
+
<td>Urban, Construction, Agricultural [https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs143_025942.pdf]</td>
<td>Infiltration, Media Filtration</td>
+
<td>Infiltration, Media Filtration [https://stormwater.pca.state.mn.us/index.php?title=Overview_for_pretreatment_settling_devices]; [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_swales&redirect=no]</td>
 
<td>No</td>
 
<td>No</td>
<td>Volume equivalent to at least 25% of water quality volume, surface area calculated from flow and particle settling velocity</td>
+
<td>Volume equivalent to at least 25% of water quality volume, surface area calculated from flow and particle settling velocity [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_swales&redirect=no]</td>
 
<td></td>
 
<td></td>
 
<td>Overflow weir at end of chamber</td>
 
<td>Overflow weir at end of chamber</td>
Line 32: Line 32:
 
<tr>
 
<tr>
 
<td>Oil/water/grit separators</td>
 
<td>Oil/water/grit separators</td>
<td>Ultra-high density, Industrial, Commercial</td>
+
<td>Ultra-high density, Industrial, Commercial [http://www.iowadnr.gov/Portals/idnr/uploads/water/stormwater/manual/iswmm_chapter11.pdf?ver=2016-04-12-161256-770]</td>
 
<td></td>
 
<td></td>
 
<td>Yes</td>
 
<td>Yes</td>
<td>Size device to pass 2-year 24-hour storm without interference and then provide bypass for larger storms</td>
+
<td>Size device to pass 2-year 24-hour storm without interference and then provide bypass for larger storms [http://prj.geosyntec.com/npsmanual/oilgritseparators.aspx]</td>
<td>8-inch diameter minimum</td>
+
<td>8-inch diameter minimum [http://www.iowadnr.gov/Portals/idnr/uploads/water/stormwater/manual/iswmm_chapter11.pdf?ver=2016-04-12-161256-770]</td>
<td>Inlet chamber (sediment trapping), oil separation/storage chamber, inverted elbow pipe to bypass chamber</td>
+
<td>Inlet chamber (sediment trapping), oil separation/storage chamber, inverted elbow pipe to bypass chamber [http://www.iowadnr.gov/Portals/idnr/uploads/water/stormwater/manual/iswmm_chapter11.pdf?ver=2016-04-12-161256-770]; [http://prj.geosyntec.com/npsmanual/oilgritseparators.aspx]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 44: Line 44:
 
<td></td>
 
<td></td>
 
<td>Yes</td>
 
<td>Yes</td>
<td>Rate-based, 80% TSS removal based on 25 gpm/sq ft settling area, treatment flow rate based on 150 gpm/sq ft settling area. Download the manufacturer’s sizing tool here (requires registration)</td>
+
<td>Rate-based, 80% TSS removal based on 25 gpm/sq ft settling area, treatment flow rate based on 150 gpm/sq ft settling area. Download the manufacturer’s sizing tool [https://www.hydro-int.com/en/hydro-dryscreen-sizing-tool here] (requires registration)</td>
<td>Max pipe diameter = 30-60 in </td>
+
<td>Max pipe diameter = 30-60 in [https://www.hydro-int.com/sites/default/files/hydro_dryscreen_technical_abstract.pdf]</td>
<td>Vertical screen weir</td>
+
<td>Vertical screen weir [https://www.hydro-int.com/sites/default/files/hydro_dryscreen_technical_abstract.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Suntree Nutrient Separating Baffle Box (NSBB)</td>
 
<td>Suntree Nutrient Separating Baffle Box (NSBB)</td>
 
<td></td>
 
<td></td>
<td>Rainwater harvesting, Wet or dry detention</td>
+
<td>Rainwater harvesting, Wet or dry detention [https://www.suntreetech.com/nsbb.html]</td>
 
<td>Yes</td>
 
<td>Yes</td>
<td>Q = ciA (runoff coeff. * intensity * area), then see Table 1 (NJCAT) </td>
+
<td>Q = ciA (runoff coeff. * intensity * area), then see [https://www.njstormwater.org/pdf/2016-11-03_nsbb_final_cert-signed_wom.pdf Table 1] (NJCAT) [https://www.njstormwater.org/pdf/2016-11-03_nsbb_final_cert-signed_wom.pdf]</td>
<td>See tables for inlet and outlet placement depending on manhole and pipe diameters</td>
+
<td>[http://www.momentumenv.com/wp-content/uploads/2015/09/Manhole-Sizing-Charts.pdf See tables] for inlet and outlet placement depending on manhole and pipe diameters</td>
<td>Three chambers/stages</td>
+
<td>Three chambers/stages [https://www.njstormwater.org/pdf/2016-11-03_nsbb_final_cert-signed_wom.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 63: Line 63:
 
<td>Yes</td>
 
<td>Yes</td>
 
<td></td>
 
<td></td>
<td>Precast boxes: can be used for pipes up to 48 in diameter, up to 60 in if cast in place</td>
+
<td>Precast boxes: can be used for pipes up to 48 in diameter, up to 60 in if cast in place [https://nepis.epa.gov/Exe/ZyNET.exe/P100IL55.TXT?ZyActionD=ZyDocument&Client=EPA&Index=2000+Thru+2005&Docs=&Query=&Time=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex%20Data%5C00thru05%5CTxt%5C00000032%5CP100IL55.txt&User=ANONYMOUS&Password=anonymous&SortMethod=h%7C-&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g8/x150y150g16/i425&Display=hpfr&DefSeekPage=x&SearchBack=ZyActionL&Back=ZyActionS&BackDesc=Results%20page&MaximumPages=1&ZyEntry=1&SeekPage=x&ZyPURL]</td>
<td>Weir height = 3 ft, set at same level as pipe invert</td>
+
<td>Weir height = 3 ft, set at same level as pipe invert [https://nepis.epa.gov/Exe/ZyNET.exe/P100IL55.TXT?ZyActionD=ZyDocument&Client=EPA&Index=2000+Thru+2005&Docs=&Query=&Time=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex%20Data%5C00thru05%5CTxt%5C00000032%5CP100IL55.txt&User=ANONYMOUS&Password=anonymous&SortMethod=h%7C-&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g8/x150y150g16/i425&Display=hpfr&DefSeekPage=x&SearchBack=ZyActionL&Back=ZyActionS&BackDesc=Results%20page&MaximumPages=1&ZyEntry=1&SeekPage=x&ZyPURL]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 72: Line 72:
 
<td>No</td>
 
<td>No</td>
 
<td>Rate-based sizing</td>
 
<td>Rate-based sizing</td>
<td>Model V510: inlet/outlet diameter = 15 in diameter</td>
+
<td>Model V510: inlet/outlet diameter = 15 in diameter [http://www.njcat.org/uploads/newDocs/StormProVerificationReportFinal.pdf]</td>
<td>Baffle wall, bypass pipe</td>
+
<td>Baffle wall, bypass pipe [http://www.njcat.org/uploads/newDocs/StormProVerificationReportFinal.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 82: Line 82:
 
<td>Rate-based sizing</td>
 
<td>Rate-based sizing</td>
 
<td></td>
 
<td></td>
<td>Surface skimming weir, flow to and from offline manhole storage</td>
+
<td>Surface skimming weir, flow to and from offline manhole storage [http://www.virginiadot.org/business/resources/LocDes/BMP_Design-Manual/Chapter_16_Hydrodynamic_Separators.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 89: Line 89:
 
<td></td>
 
<td></td>
 
<td>Yes</td>
 
<td>Yes</td>
<td>Sizing with SHSAM</td>
+
<td>Sizing with [https://www.barr.com/WhatsNew/SHSAM/SHSAMapp.asp SHSAM] [https://upstreamtechnologies.us/docs/SAFL-Baffle-Design-Guide.pdf]</td>
 
<td>Top of SAFL baffle roughly 2-6 in above top of inlet, Sump depth below outlet >= 3 ft, bottom of SAFL baffle at 1 ft below invert of outlet . Max inlet diameter: 15-54 inches</td>
 
<td>Top of SAFL baffle roughly 2-6 in above top of inlet, Sump depth below outlet >= 3 ft, bottom of SAFL baffle at 1 ft below invert of outlet . Max inlet diameter: 15-54 inches</td>
<td>Baffle wall</td>
+
<td>Baffle wall [https://www.dnr.state.mn.us/water_access/bmp/sump_manhole_with_safl_baffle_bmp.html]; [https://upstreamtechnologies.us/docs/SAFL-Baffle-Design-Guide.pdf]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Deep sump catch basin</td>
 
<td>Deep sump catch basin</td>
<td>Residential, Office, Retail</td>
+
<td>Residential, Office, Retail [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
<td></td>
 
<td></td>
 
<td>No</td>
 
<td>No</td>
<td>Rate-based sizing, flow not to exceed capacity of inlet grate</td>
+
<td>Rate-based sizing, flow not to exceed capacity of inlet grate [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
<td>Outlet below water surface level to allow floatables to remain on top. Inlet 4 ft above water surface level. </td>
 
<td>Outlet below water surface level to allow floatables to remain on top. Inlet 4 ft above water surface level. </td>
<td>Hooded outlet to prevent floatable materials and trash from entering storm drain system, weep hole above outlet pipe , </td>
+
<td>Hooded outlet to prevent floatable materials and trash from entering storm drain system, weep hole above outlet pipe [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]; [http://www.iowadnr.gov/Portals/idnr/uploads/water/stormwater/manual/iswmm_chapter11.pdf?ver=2016-04-12-161256-770]</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Forebay/pre-settling basin</td>
 
<td>Forebay/pre-settling basin</td>
 
<td></td>
 
<td></td>
<td>Wet Pond, Storm Water Treatment Wetland</td>
+
<td>Wet Pond, Storm Water Treatment Wetland [http://www.cleanwaterways.org/downloads/criteria_2001_edition.pdf]</td>
 
<td>No</td>
 
<td>No</td>
<td>V with 1-2 ac imp area = 0.01* WQV; Max depth = 12 in; V with 2-5 ac imp area = 0.02 * WQV; Max depth = 18 in; V with 5-10 ac imp area = 0.03 * WQV; Max depth = 18 in; V with >10 ac imp area = 0.03 * WQV; Max depth = 24-30 in</td>
+
<td>V with 1-2 ac imp area = 0.01* WQV; Max depth = 12 in; V with 2-5 ac imp area = 0.02 * WQV; Max depth = 18 in; V with 5-10 ac imp area = 0.03 * WQV; Max depth = 18 in; V with >10 ac imp area = 0.03 * WQV; Max depth = 24-30 in [https://udfcd.org/wp-content/uploads/uploads/vol3%20criteria%20manual/06_T-05%20Extended%20Detention%20Basin.pdf]</td>
<td>Size outlet based on avg release rate and average head (elev. diff. between permanent pool water surface elev. and water quality volume elev.), non-erosive conditions , . Rip rap channel, pipe outlet or concrete channel with a notch outlet can be constructed between forebay and downstream practice</td>
+
<td>Size outlet based on avg release rate and average head (elev. diff. between permanent pool water surface elev. and water quality volume elev.), non-erosive conditions. [http://www.cleanwaterways.org/downloads/criteria_2001_edition.pdf]; [https://stormwater.pca.state.mn.us/index.php?title=Design_criteria_for_stormwater_ponds] Rip rap channel, pipe outlet or concrete channel with a notch outlet can be constructed between forebay and downstream practice [http://prj.geosyntec.com/npsmanual/deepsumpcatchbasin.aspx]</td>
 
<td>Anticipate overflow of forebay basin.  Adequate protection of downstream structure or berm is necessary along with appropriate erosion control measures. If piped flows are used in the design, minimum recommended pipe diameter is 8 in, and recommended only for larger catchments.</td>
 
<td>Anticipate overflow of forebay basin.  Adequate protection of downstream structure or berm is necessary along with appropriate erosion control measures. If piped flows are used in the design, minimum recommended pipe diameter is 8 in, and recommended only for larger catchments.</td>
 
</tr>
 
</tr>
 
</table>
 
</table>

Revision as of 18:20, 3 June 2019

Above ground and below grade storage and settling - system and component sizing
Link to this table

Device Land use Downstream BMP (type) Enhancement opportunity Sizing calculations Inlets/oulets Flow diversion structures
StormTech Isolator Row Residential, Urban, Commercial StormTech detention/ infiltration arc storage chambers [1] Yes Volume-based for sites with good infiltrative soils, or more commonly rate-based using a water quality flow <= 2.5 gpm/sq ft of bottom area using two layers of woven geotextile, see Table 2. See design tool from manufacturer (does not require registration). [2] Manhole with overflow weir before pretreatment row
Settling chamber/vault Urban, Construction, Agricultural [3] Infiltration, Media Filtration [4]; [5] No Volume equivalent to at least 25% of water quality volume, surface area calculated from flow and particle settling velocity [6] Overflow weir at end of chamber
Oil/water/grit separators Ultra-high density, Industrial, Commercial [7] Yes Size device to pass 2-year 24-hour storm without interference and then provide bypass for larger storms [8] 8-inch diameter minimum [9] Inlet chamber (sediment trapping), oil separation/storage chamber, inverted elbow pipe to bypass chamber [10]; [11]
Hydro Dry Screen Residential, Commercial Yes Rate-based, 80% TSS removal based on 25 gpm/sq ft settling area, treatment flow rate based on 150 gpm/sq ft settling area. Download the manufacturer’s sizing tool here (requires registration) Max pipe diameter = 30-60 in [12] Vertical screen weir [13]
Suntree Nutrient Separating Baffle Box (NSBB) Rainwater harvesting, Wet or dry detention [14] Yes Q = ciA (runoff coeff. * intensity * area), then see Table 1 (NJCAT) [15] See tables for inlet and outlet placement depending on manhole and pipe diameters Three chambers/stages [16]
Manhole Baffle Box Yes Precast boxes: can be used for pipes up to 48 in diameter, up to 60 in if cast in place [17] Weir height = 3 ft, set at same level as pipe invert [18]
Environment 21 StormPro No Rate-based sizing Model V510: inlet/outlet diameter = 15 in diameter [19] Baffle wall, bypass pipe [20]
BaySeparator by BaySaver Yes Rate-based sizing Surface skimming weir, flow to and from offline manhole storage [21]
Sump Manhole with SAFL Baffle Residential, Commercial Yes Sizing with SHSAM [22] Top of SAFL baffle roughly 2-6 in above top of inlet, Sump depth below outlet >= 3 ft, bottom of SAFL baffle at 1 ft below invert of outlet . Max inlet diameter: 15-54 inches Baffle wall [23]; [24]
Deep sump catch basin Residential, Office, Retail [25] No Rate-based sizing, flow not to exceed capacity of inlet grate [26] Outlet below water surface level to allow floatables to remain on top. Inlet 4 ft above water surface level. Hooded outlet to prevent floatable materials and trash from entering storm drain system, weep hole above outlet pipe [27]; [28]
Forebay/pre-settling basin Wet Pond, Storm Water Treatment Wetland [29] No V with 1-2 ac imp area = 0.01* WQV; Max depth = 12 in; V with 2-5 ac imp area = 0.02 * WQV; Max depth = 18 in; V with 5-10 ac imp area = 0.03 * WQV; Max depth = 18 in; V with >10 ac imp area = 0.03 * WQV; Max depth = 24-30 in [30] Size outlet based on avg release rate and average head (elev. diff. between permanent pool water surface elev. and water quality volume elev.), non-erosive conditions. [31]; [32] Rip rap channel, pipe outlet or concrete channel with a notch outlet can be constructed between forebay and downstream practice [33] Anticipate overflow of forebay basin. Adequate protection of downstream structure or berm is necessary along with appropriate erosion control measures. If piped flows are used in the design, minimum recommended pipe diameter is 8 in, and recommended only for larger catchments.