<td>Bioretention</td>
+
<td>Bioretention, dry swale, permeable pavement, tree trench/box</td>
<td>Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include and infiltration gallery below the underdrain, so long as it is appropriately sized.</td>
+
<td>Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include an infiltration gallery below the underdrain, so long as it is appropriately sized.</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Media filter</td>
 
<td>Media filter</td>
 
<td>Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized.</td>
 
<td>Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized.</td>
</tr>
 
<tr>
 
<td>Vegetative filter</td>
 
<td>
 
*Recommended practice in areas of shallow bedrock and soil
 
*Dry swales with engineered soil media will need an underdrain if minimum separation distance of three feet is not present between practice bottom and bedrock</td>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 38: Line 32:
 
</table>
 
</table>
  
<noinclude>[[category:table]]</noinclude>
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/General bmp information]]
 +
</noinclude>

Latest revision as of 20:04, 4 August 2022

This table shows structural BMP use in soil with low infiltration capacity
Link to this table

BMP Low infiltration capacity soil considerations
Bioretention, dry swale, permeable pavement, tree trench/box Should be constructed with an underdrain. Recharge criteria, if applicable, can be met by modifying the design to include an infiltration gallery below the underdrain, so long as it is appropriately sized.
Media filter Recommended practice in tight soils. Some design variants can be modified to incorporate an infiltration gallery that can help meet recharge criteria, if properly sized.
Infiltration trench or basin
  • Not recommended as a practice
  • Soils analysis should be conducted to confirm limiting aspects of soil profile
Stormwater ponds Acceptable practice with tight soils. Soils should help maintain permanent pool.
Constructed wetlands
  • Acceptable practice with tight soils. Soils should help maintain permanent pool if practice is not tied into groundwater table.
  • Compost amendments may be necessary to establish suitable planting beds