Village of Algonquin, Kane County, Illinois - Step pool swale

  • Location: Village of Algonquin, Kane County, Illinois
  • Owners: Village of Algonquin
  • Designer: HR Green
  • Year of Completion: November 2018 – December 2018
  • Design Features: 64 ln-ft step-pool swale, two-stage formal weir
  • Total Drainage Area: 430 acres of mixed residential
  • Total Construction Cost: $102,000

Project Summary – Souwanas Creek

HR Green worked with the Village of Algonquin, Kane County, Illinois, to address major gulley erosion and a failing culvert that threatened private properties and downstream water quality. The project area is largely developed with 430 acres of largely mixed residential and commercial development with 170 acres of impervious ground cover. Runoff from the watershed discharges to the Fox River approximately 3,600 feet downstream from the project site. The project addressed a failing corrugated metal culvert and downstream gulley erosion that lead to severe gully erosion and a six-foot sink hole had formed downstream of the culvert. Given that the existing culvert had failed to prevent slope erosion at its outfall, a system was designed to safely convey runoff the bottom of the slope.

This project consists of the following elements to safely convey water down a moderately steep, erodible slope:

  1. A grouted limestone weir structure to detain and regulate watershed flows above the slope.
  2. A rocked step-pool swale to convey water to the bottom of the slope.
  3. A stable outfall to the Souwanas Creek.
  4. Native plant revegetation.

The total length of the step-pool swale was 64 linear feet, 6 feet in cross section and placed at a 3-4% overall grade. At the step-pool swale’s outfall, runoff was discharged to the intermittent flow channel of Souwanas Creek. The project was built in the winter to avoid wet conditions that had potential to undermine the construction.

Though this channel is mapped as a WOTUS, the flow regime is very similar to most step-pool swale conditions and was considered a fitting example. This case study is not intended to reflect stream restoration or stabilization nor present any guidance for fluvial systems management.

The project was designed and constructed from November, 2018 to December, 2018.

Design Consideration Summary

Each element of the project followed local regulatory requirements during the analysis and design of the resulting system. A major design consideration was detention of flows above the step-pool system to regulate flows. In as such, a grouted limestone weir structure was designed to control the flow of water to ensure step-pool stability (Figure 2). This two-stage weir allows normal flow conditions to pass directly to the step-pool swale while the 2-year event flows pass through the second stage. The weir is designed to route flows up to the 10-year event. The weir system was designed using XPSWMM. The resulting upstream detention area holds 0.18-acre feet of water during the 10-year storm. Flows leaving the weir were then considered when designing the step-pool swale.

The step-pool swale designed in profile and cross section to accommodate the 3-4% grade leading from the weir structure to the existing downstream streambed (Figures 3 and 4).The step-pool consists of 12-foot long rocked runs with pools above a rocked riffle that drops 6-inches to the next run/pool segment . Rock used for these features include stone of specific grading as identified in Figure 4 per Section 1005 in Illinois DOT’s “Standard Specifications for Road and Bridge Construction”, herein referred to as Section 1005. The cross sectional area of this system was designed to convey up to the 10-year flows from the weir. The depth and width of the cross sectional area of the swale was determined using XPSWMM considering shear stress. Eight inches of riprap 1, as specified in Section 1005, was used to line the bottom of the graded swale with an additional 30 inches of riprap 5 rock, specified in Section 1005, placed on top. Side slopes were protected by placement of riprap 3 rock, specified in Section 1005. The swale discharged to the stable downstream streambed.

A revegetation plan was developed for the site to be installed after construction of the weir and step-pool swale. The site was initially populated with invasive species prior to the completion of this project (primarily Buckthorn and Reed Canary Grass). These species were identified during a previously completed survey. During the site clearing phase of this project all buckthorn, honeysuckle, and trees under 6-inch diameter at breast height were removed.

After construction, the site via revegetation of native plant species. Areas upstream of the stone weir control structure and adjacent to the step pool swale were restored with a floodplain seed mixture while areas downstream of this practice were restored with a mesic savanna seed mixture.

The floodplain seed mixture’s most predominant species were:

  • Andropogon gerardii (big bluestem)
  • Panicum virgatum (switch grass)
  • Asclepias incarnata (swamp milkweed)
  • Zizia aurea (golden alexanders).

The Mesic Savanna seed mixture was predominantly comprised of:

  • Elymus hystrix (bottlebrush grass)
  • Andropogon gerardii (big bluestem)
  • Bromus pubescens (woodland brome)
  • Echinacea purpurea (purple coneflower)
  • Cassia hebecarpa (wild senna)
  • Alluim cernuum (nodding wild onion)
  • Tradescantia oheinsis (common spiderwort)
  • Zizia aurea (golden alexanders)

The site was prepped for seeding by scarifying the ground surface prior to broadcasting the seed and seeding was performed by hand broadcast at a rate of 7.1 pounds per acre and 16.1 pounds per acre for the floodplain seed mix and mesic savanna seed mix, respectively. Erosion control blankets (SC-150BM and S-75) were used as mulching and temporary soil stabilization over the seeded areas.

Applicable Costs

This project was a design-build project completed with an expedited schedule and a budget of $102,000. Quantities needed to complete this project are identified in the “Summary of Quantities” table shown to the right and associated costs are summarized as follows:

  • Riprap and Stone: $58,500
  • Culvert Removal and Excavation: $13,500
  • Seeding: $2,000
  • Flow Bypass: $15,000
  • Clearing Vegetation: $1,000
  • Erosion Control: $10,000
  • Water District Permit Fee (McHenry Lake County): $1,439
  • State Permit Fee (EcoCAT): $512

Maintenance

During construction activities, on-site inspections were completed to ensure proper installation and to determine if additional erosion or sediment control measures were needed. Once construction was completed, the contractor was responsible for a period of three years to guarantee that the vegetation has successfully.

An Operation & Maintenance (O&M) Plan was completed to address the ongoing activities to maintain the BMPs implemented in this project. These activities are outlined to ensure the project’s long-term viability with a focus on sediment and debris removal, native vegetation management, and stability of the step pool swale.

Monitoring and Reporting

The Village employed an ecological firm to maintain, monitor, and report on the project site for the first three growing seasons and they are expected to extend this to growing seasons 4 through 10. Long-term monitoring is to be completed at the Village’s discretion. Monitoring and reports specifically address how well the planted communities and restoration BMPs meet and maintain the 3-year performance standards. Final Construction Documents include a Planting Plan and Details Map that are used during site visits to locate planting zones and stream stabilization structures.

Restored areas will be assessed twice annually for a period of three years and at least once annually from the fourth to tenth years to document vegetation establishment and general conditions of the project area and structures. Installed native vegetation is required to meet the 3-Year Performance Standards found in the Performance Standards section below. Signs of water quality degradation, such as excessive turbidity, sediment, nutrient loading, odor, debris, and adverse changes to aquatic and terrestrial wildlife will be monitored and noted for further investigation. Sources of water quality impairments may be from off-site and not immediately evident. Upstream off-site changes in land use or land management will also then be noted along with any impacts from intense rainfall events.

An annual letter report will be prepared and submitted to the Village of Algonquin and Chicago District Corps of Engineers at the end of each growing season and not later than December 31 of the monitoring year.

Performance Standards

Reports will address how well the planted communities and stream restoration BMPs meet 3-year performance standards. Standard categories include native vegetation performance and stream stabilization performance standards. The stream stabilization standard did not include additional areas but guaranteed in-stream structures are stay in place, that if rock washes away that it is replaced, repair be completed using a light tracked equipment to minimize disturbance to exposed areas and that exposed bare soil must be stabilized with materials specified in the design plan. Stream structure repairs may be done with nominal dewatering techniques such as sandbag diversions. The vegetation performance standards include criteria related to native vegetation seed and herbaceous perennial planting establishment and tree planting.