*The City of Cottage Grove installed a rainwater harvesting system that captures, stores and cleans City Hall rooftop runoff, which is then used to irrigate planting areas throughout the site. The system reduces the City's annual water usage by 570,000 gallons. This project was partially funded with a grant from the South Washington Watershed District. For more information, contact Jennifer Levit, City of Cottage Grove at jlevitt@cottage-grove.org | *The City of Cottage Grove installed a rainwater harvesting system that captures, stores and cleans City Hall rooftop runoff, which is then used to irrigate planting areas throughout the site. The system reduces the City's annual water usage by 570,000 gallons. This project was partially funded with a grant from the South Washington Watershed District. For more information, contact Jennifer Levit, City of Cottage Grove at jlevitt@cottage-grove.org | ||
*The City of Lakeville has a stormwater pond irrigation system located in King Park. The [http://www.improvethevermillionriver.org/attachments/060_Project%20Fact%20Sheet%20-%20Lakeville%20King%20Park%20Stormwater%20Irrigation%20Project.pdf project] was completed cooperatively by the City of Lakeville and the Vermillion River Watershed Joint Powers Organization. | *The City of Lakeville has a stormwater pond irrigation system located in King Park. The [http://www.improvethevermillionriver.org/attachments/060_Project%20Fact%20Sheet%20-%20Lakeville%20King%20Park%20Stormwater%20Irrigation%20Project.pdf project] was completed cooperatively by the City of Lakeville and the Vermillion River Watershed Joint Powers Organization. | ||
− | *Edison High School in Northeast Minneapolis will be irrigating the athletic field using stormwater runoff from the gymnasium roof and new plaza. For more information, go to the [http://mwmo.org/projects/edison-high-school-northeast-green-campus-initiative/ Mississippi Watershed Management Organization's] | + | *Edison High School in Northeast Minneapolis will be irrigating the athletic field using stormwater runoff from the gymnasium roof and new plaza. For more information, go to the [http://mwmo.org/projects/edison-high-school-northeast-green-campus-initiative/ Mississippi Watershed Management Organization's] web site. |
− | web site. | ||
*The City of Roseville and the Capitol Region Watershed District are constructing a project to treat stormwater and store it for use as irrigation at the softball field at [http://www.cityofroseville.com/2900/Upper-Villa-Park-Stormwater-Infiltration/ Upper Villa Park.] | *The City of Roseville and the Capitol Region Watershed District are constructing a project to treat stormwater and store it for use as irrigation at the softball field at [http://www.cityofroseville.com/2900/Upper-Villa-Park-Stormwater-Infiltration/ Upper Villa Park.] | ||
*[[File:New Hope Rainwater Harvesting and Water Quality System Sign High Res.pdf|City of New Hope Rainwater Harvesting (Stormwater Re-use) Water Quality System]] | *[[File:New Hope Rainwater Harvesting and Water Quality System Sign High Res.pdf|City of New Hope Rainwater Harvesting (Stormwater Re-use) Water Quality System]] |
In 2012 the City of Cottage Grove completed construction of the new City Hall and Public Safety complex, designed by Wold Architects. The building is situated in a growing part of the community, directly adjacent to Cottage Grove Ravine Regional Park, a natural resource and recreation amenity area which features unique habitat and a beloved fishing lake. In an effort to reduce water use and impacts on stormwater runoff, the building design incorporates a stormwater harvester system. The harvester reuses stormwater collected from the building's roof for irrigation of the green space around the building and the Veterans Memorial fountain located at the building entrance. This system collects runoff from the 0.9 acre roof and stores it in an underground storage tank. From the storage tank, the water is filtered and treated with ultraviolet light then pumped through the irrigation system for use on the 7-acre City Hall grounds, and at the fountain. The purpose of the system is to provide the dual benefits of reducing the use of groundwater for landscape irrigation and minimizing stormwater runoff to Ravine Lake.
In 2014, the City of Woodbury, with funding from the South Washington Watershed District, constructed stormwater reuse for irrigation systems at Eagle Valley and Prestwick golf clubs. Each system collects runoff from a large drainage area containing roads, housing developments, and a golf course and stores it in a centralized pond. A pump then draws water from the pond for use in golf course irrigation. The total cost of both projects was $700,000.00. The catalyst for the projects was the planned reconstruction of CSAH 19 (Woodbury Drive), changing it from a rural 2-lane road to an urban 4-lane road. The goals for the project were to have no measurable downstream stormwater impacts from the road reconstruction project, and to help achieve Colby Lake’s target TMDL standard to reduce phosphorus (TP) inputs by 30 lbs per year.
Prior to the reuse for irrigation project Eagle Valley Golf Course pumped 30 million gallons of well water annually to irrigate approximately 60 acres of golf course turf and landscaping. This project collects stormwater runoff from a 430 acre drainage area covering the golf course, surrounding neighborhoods, and Woodbury Drive into a storage pond on the course. The drainage area is 33.8% impervious. The reuse system can pump approximately 22.5 million gallons of stormwater for irrigation from the pond annually. The remainder of irrigation water that is needed will be supplied by the existing well. Stored water can also be routed through a babbling brook landscape feature on the golf course. The P8 modeled water quality benefits of the project at Eagle Valley were reductions in TP to Colby Lake of 56 lbs per year, and a volume reduction of 6.1 acre/ft per event.
Prestwick golf club regularly irrigates up to 75 acres of turf and landscaping. Previously, course managers pumped 35 million gallons of water annually from a course well to accomplish this. The stormwater reuse system which was installed in 2014 can now supply approximately 17.5 million gallons of water from the storage pond annually. The 130 acre drainage area for the pond is 27% impervious. The remainder of irrigation water that is needed will be supplied by the existing well. The P8 modeled water quality benefits of the project at Prestwick were reductions in TP of 43 lbs per year, and a volume reduction of 3.5 acre/ft per event.
The City of Woodbury far exceeded their goals for water quality and volume reduction with the implementation of these two reuse projects at Prestwick and Eagle Valley. In total the projects reduce TP loading to local lakes by almost 100 lbs per year, and also reduces volume by 9.6 acre/ft for each event. The goals were 35 lbs of TP per year, and 1.84 acre/feet per event. In addition, both projects combine to reduce pumping from local aquifers by 40 million gallons annually by utilizing surface storage features (ponds) that add beauty and challenge to both golf courses.
Club West Partners, the developer of Harvest Estates, worked with the Carver County Watershed Management Organization (CCWMO) to implement a stormwater harvest and use system that would meet stormwater, TP, and TSS reduction requirements (90% TSS and TP reduction, per CCWMO rules) for that subwatershed. Designed by Alliant Engineering, the harvest and use project utilizes stormwater runoff draining from a new development, Harvest Estates, for irrigation of common areas within the development. The site is located in southwest Chaska, MN, in close proximity to the Minnesota River, where population growth trends continue to encroach on undeveloped areas of the watershed. This project is one of five sites in Carver County where stormwater is being used to irrigate green space in order to mitigate the impacts of population growth on groundwater withdrawals.
At Harvest Estates, stormwater is collected into three stormwater ponds. Two intake pumps draw the stormwater from two of the three ponds to irrigate a central park and boulevard at the entrance of the development. By incorporating the harvest and use system into the construction of the new development, overall stormwater runoff impacts are partially mitigated and use of potable water for irrigation is reduced. Up to 22.2 million gallons of harvested stormwater can be used to irrigate the park and boulevards. The project goal is to harvest and use up to 12,500 cubic feet of stormwater per week, or equivalent to a depth of ½”of stormwater over the surface area of the new impervious paving in the development (18.8 acres total). The harvest and use system uses a 1.5-2.0 HP centrifugal stormwater pump, which is then transferred and managed through irrigation controller pedestals that allow for the efficient harvest and use of stormwater. The system reduces the need to pump irrigation water from conventional sources, with a bypass switch for municipal water only in cases of decreased rainfall. Harvested stormwater pumped from the two ponds goes through a filter system to remove sediment prior to irrigation uses. The modeled water quality benefits of the project are TP reductions up to 4.37 lb per year and TSS reductions up to 1,503 lb per year. To date, roughly 1.5 million gallons of stormwater have irrigated the site through the harvest and use system, with an overall cost savings of $3,000 each year due to the decreased use of potable water.
Name of Project: Mississippi Watershed Management Organization (MWMO)
Type of Reuse System: Cistern
Overview: The cistern, located at the MWMO, utilizes rooftop runoff from the main office area roof to water trees in a trench system.
Location: Mississippi Watershed Management Organization, 2522 Marshall Street NE, Minneapolis 55418
Owners: Mississippi Watershed Management Organization
Contractors: Meisinger Construction-general contractor for facility construction
Operators: Mississippi Watershed Management Organization
Cost (additional plumbing would be needed if plumbed into the building to be used as grey water):
Type and size of system: 4,000 gallon capacity CorGal Water Tank, volume annual dependent on rainfall, filled by roof runoff only
Year of Completion: 2012
Drivers/Stormwater Goals: To water trees, reduce stormwater runoff that reaches the river, infiltrate rainwater. Future use as grey water in facility.
Funding sources: Public – MWMO funding
Monitoring: Total Suspended Solids, VSS, bacteria, once every 3 months
Web links: http://mwmo.org/
Lessons Learned: Design flaws – the plumbing was not correct and all the water drained out, the rain leader diverter operation was not intuitive. Additionally plumbing code hindered process of connecting to facility to be used as grey water. Staff opted to do this at a later time once plumbing codes were updated and other projects set precedence.
For more information contact:
Below are Minnesota examples of outdoor and indoor reuse systems.