m
m
Line 1: Line 1:
to be developed
+
[[File:Biofiltration planter section.png|alt=image of biofiltration planter|<font size=3>Example of a specification: Biofiltration planter section</font size>]]
 +
[[File:green roof schematic.jpg|thumb|300px|alt=illustration showing typical green roof sections|<font size=3>Example of a detail: Schematic showing the different components of a green roof. Thicknesses of some layers vary with the design (e.g. extensive vs. intensive roofs).</font size>]]
 +
 
 +
This page is a subcategory of the Level 1 Category Best management practices (bmps). It provides links to pages and subcategories that provide specifications and details. Specifications are technical guidelines that must or should be followed for a bmp. Details provide recommended guideline or general information.
 +
 
 +
This page provides links to information on how to design, construct/build, operate and maintain, and assess the performance of bmps. Numerous tables and images in this manual provide specifications and details.
  
 
[[Category:Level 1 - Best Management practices]]
 
[[Category:Level 1 - Best Management practices]]

Revision as of 21:19, 18 July 2022

image of biofiltration planter

illustration showing typical green roof sections
Example of a detail: Schematic showing the different components of a green roof. Thicknesses of some layers vary with the design (e.g. extensive vs. intensive roofs).

This page is a subcategory of the Level 1 Category Best management practices (bmps). It provides links to pages and subcategories that provide specifications and details. Specifications are technical guidelines that must or should be followed for a bmp. Details provide recommended guideline or general information.

This page provides links to information on how to design, construct/build, operate and maintain, and assess the performance of bmps. Numerous tables and images in this manual provide specifications and details.