m
m
Line 17: Line 17:
 
<tr>
 
<tr>
 
<td>[[Bioretention]] with underdrain</td>
 
<td>[[Bioretention]] with underdrain</td>
<td>OK. Use impermeable liner.</td>
+
<td>OK. Under certain conditions use [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management impermeable liner]</td>
 
<td>Recommended.</td>
 
<td>Recommended.</td>
 
<td>OK. Use salt-tolerant vegetationand pre-treatment. Chlorides will move through untreated.</td>
 
<td>OK. Use salt-tolerant vegetationand pre-treatment. Chlorides will move through untreated.</td>
Line 25: Line 25:
 
<tr>
 
<tr>
 
<td>Filtration<sup>a</sup></td>
 
<td>Filtration<sup>a</sup></td>
<td>OK. Use impermeable liner</td>
+
<td>OK. Under certain conditions use [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management impermeable liner]</td>
 
<td>Recommended</td>
 
<td>Recommended</td>
 
<td>OK. Place below frost line. Use pre-treatment. Chlorides will move through untreated.</td>
 
<td>OK. Place below frost line. Use pre-treatment. Chlorides will move through untreated.</td>
Line 39: Line 39:
 
<tr>
 
<tr>
 
<td>[[Stormwater ponds]]</td>
 
<td>[[Stormwater ponds]]</td>
<td>OK. Use impermeable liner; limit depth; geotechnical investigation needed.</td>
+
<td>OK. Under certain conditions use [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management impermeable liner]; limit depth; geotechnical investigation needed.</td>
 
<td>Limited due to available depth and large surface area requirement.</td>
 
<td>Limited due to available depth and large surface area requirement.</td>
 
<td>Recommended. Limit depth to avoid stratification. Adapt outlet structure.</td>
 
<td>Recommended. Limit depth to avoid stratification. Adapt outlet structure.</td>
Line 46: Line 46:
 
<tr>
 
<tr>
 
<td>[[Stormwater wetlands|Constructed wetlands]]</td>
 
<td>[[Stormwater wetlands|Constructed wetlands]]</td>
<td>OK. Use impermeable liner; limit depth; geotechnical investigation needed.</td>
+
<td>OK. Under certain conditions use [http://stormwater.pca.state.mn.us/index.php/Liners_for_stormwater_management impermeable liner]; limit depth; geotechnical investigation needed.</td>
 
<td>OK. Large surface area.</td>
 
<td>OK. Large surface area.</td>
 
<td>OK. Use salt-tolerant vegetation.</td>
 
<td>OK. Use salt-tolerant vegetation.</td>

Revision as of 19:17, 2 December 2015

This table shows the summary of climate, soil and terrain factors that affect the selection of Best Management Practices.
Link to this table

BMP Karst Bedrock and shallow soils High snowfall - meltwater treatment Low rainfall
Bioretention - no underdrain Not recommended. Extensive pre-treatment required Not recommended due to separation distance OK. Use salt-tolerant vegetationand pre-treatment. Chlorides will move through untreated. OK. Use appropriate vegetation.
Bioretention with underdrain OK. Under certain conditions use impermeable liner Recommended. OK. Use salt-tolerant vegetationand pre-treatment. Chlorides will move through untreated. OK. Use appropriate vegetation.
Filtrationa OK. Under certain conditions use impermeable liner Recommended OK. Place below frost line. Use pre-treatment. Chlorides will move through untreated. Recommended.
Infiltrationb Not recommended. Extensive pre-treatment required Not recommended due to separation distance OK but could be limited. Active management needed to prevent infiltration of chlorides and soluble toxics. Recommended
Stormwater ponds OK. Under certain conditions use impermeable liner; limit depth; geotechnical investigation needed. Limited due to available depth and large surface area requirement. Recommended. Limit depth to avoid stratification. Adapt outlet structure. Limited. Water budget calculations may show this to be unsuitable.
Constructed wetlands OK. Under certain conditions use impermeable liner; limit depth; geotechnical investigation needed. OK. Large surface area. OK. Use salt-tolerant vegetation. Limited. Water budget calculations may show this to be unsuitable.

aSee sand filters or swales
bSee infiltration trench or infiltration basin