(Created page with "<center><font size=3>'''Comparison of Annual Maintenance Cost Estimator Models to Study Data'''</font size><br> Link to this Comparison of Annual Maintenance Cost Estimator...")
 
m
 
(One intermediate revision by the same user not shown)
Line 10: Line 10:
 
<th>This study  Construction cost converted to 2010 &#128178;  per ft<sup>3</sup> of treated water volume)</th>
 
<th>This study  Construction cost converted to 2010 &#128178;  per ft<sup>3</sup> of treated water volume)</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Constructed Wetlands</td>
 
<td>Constructed Wetlands</td>
Line 17: Line 16:
 
<td>No data</td>
 
<td>No data</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Wet Detention Basins</td>
 
<td>Wet Detention Basins</td>
Line 25: Line 22:
 
<td>3.5%</td>
 
<td>3.5%</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Infiltration Trenches</td>
 
<td>Infiltration Trenches</td>
Line 33: Line 28:
 
<td>3.6%</td>
 
<td>3.6%</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Bioretention Basins</td>
 
<td>Bioretention Basins</td>
Line 41: Line 34:
 
<td>8.3%</td>
 
<td>8.3%</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Infiltration Basins</td>
 
<td>Infiltration Basins</td>
Line 49: Line 40:
 
<td>No data</td>
 
<td>No data</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Infiltration Basins</td>
 
<td>Infiltration Basins</td>
Line 57: Line 46:
 
<td>21.</td>
 
<td>21.</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Dry Ponds</td>
 
<td>Dry Ponds</td>
Line 65: Line 52:
 
<td>No data</td>
 
<td>No data</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>Sand Filters</td>
 
<td>Sand Filters</td>
Line 74: Line 58:
 
<td>No data</td>
 
<td>No data</td>
 
</tr>
 
</tr>
 
 
 
</table>
 
</table>
  
 
+
<noinclude>
 
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Costs, benefits]]
 
+
</noinclude>
 
 
[[category:Table]]
 

Latest revision as of 20:34, 3 August 2022

Comparison of Annual Maintenance Cost Estimator Models to Study Data
Link to this table
BMP USEPA (1999) As percent of construction cost(💲) Weiss et al. (2005) As percent of construction cost(💲) This study Construction cost converted to 2010 💲 per ft3 of treated water volume)
Constructed Wetlands 0.02 4% - 14.2% No data
Wet Detention Basins Not reported 1.9% - 10.2% 3.5%
Infiltration Trenches 5% - 20% 5.1% – 12.6% 3.6%
Bioretention Basins 5% - 7% 0.7% - 10.9% 8.3%
Infiltration Basins 1% - 10% 2.8% - 4.9% No data
Infiltration Basins 1.80 Not reported 21.
Dry Ponds <1% 1.8% - 2.7% No data
Sand Filters 11% -13% 0.9% - 9.5% No data

This page was last edited on 3 August 2022, at 20:34.