m
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''The next section in the chapter addressing stormwater ponds is Operation and maintenance.  To proceed to that section, click [[Operation and maintenance of stormwater ponds|here]]'''.
+
The following details, with specifications, have been created for stormwater ponds (see [[CADD images for individual best management practices]]):
 +
*stormwater pond plan;
 +
*stormwater pond profile;
 +
*pond inlet; and
 +
*riser pipe outlet structure.
  
'''To return to the previous section, click [[Design specifications for stormwater ponds|here]].'''
+
<noinclude>
 +
==Related pages==
 +
*[[Overview for stormwater ponds]]
 +
*[[Types of stormwater ponds]]
 +
*[[Design criteria for stormwater ponds]]
 +
*[[Design considerations for constructed stormwater ponds used for harvest and irrigation use/reuse]]
 +
*[[Construction specifications for stormwater ponds]]
 +
<!--[[Construction observations for stormwater ponds]]-->
 +
*[[Assessing the performance of stormwater ponds]]
 +
*[[Operation and maintenance of stormwater ponds]]
 +
*[[Cost-benefit considerations for stormwater ponds]]
 +
*[[Calculating credits for stormwater ponds]]
 +
*[[Stormwater wet pond fact sheet]]
 +
<!--[[Additional considerations for stormwater ponds]]
 +
*[[Links for stormwater ponds]]
 +
*[[External resources for stormwater ponds]]-->
 +
*[[References for stormwater ponds]]
 +
<!--*[[Supporting material for stormwater ponds]]-->
 +
*[[Requirements, recommendations and information for using stormwater pond as a BMP in the MIDS calculator]]
  
[[category:BMP]]
+
[[category:Construction specifications]]
 +
</noinclude>

Revision as of 20:27, 18 September 2017