GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM

Authorization page

TABLE OF CONTENTS

I. PERMIT COVERAGE AND LIMITATIONS

A. Permit Coverage

B. Limitations of Coverage

II. SUBMITTING THE APPLICATION

A. Prerequisite for Submitting a Permit Application

B. Application and Duration of Coverage

C. Termination of Coverage

III. STORMWATER DISCHARGE DESIGN REQUIREMENTS

A. Stormwater Pollution Prevention Plan Content

B. SWPPP Amendments

C. Temporary Sediment Basins

D. Permanent Stormwater Management System

E. Record Retention

F. Training Requirements

IV. CONSTRUCTION ACTIVITY REQUIREMENTS

A. Stormwater Pollution Prevention Plan

B. Erosion Prevention Practices

C. Sediment Control Practices

D. Dewatering and Basin Draining

E. Inspections and Maintenance

F. Pollution Prevention Management Measures

G. Final Stabilization

V. GENERAL PROVISIONS

A. Applicability Criteria

B. Record Availability

C. Prohibitions

D. Transfer of Ownership or Control

E. Civil and Criminal Liability

F. Severability

G. NPDES/SDS Rule Standard General -Conditions

H. Inspection and Entry

APPENDIX A

APPENDIX B - DEFINITIONS