Line 11: Line 11:
 
<th>TOTAL AVERAGE BID</th>
 
<th>TOTAL AVERAGE BID</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=5>Part 1 - General and Erosion Control</th>
 
<th colspan=5>Part 1 - General and Erosion Control</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>MOBILIZATION</td>
 
<td>MOBILIZATION</td>
Line 24: Line 21:
 
<td>&#128178;23,340</td>
 
<td>&#128178;23,340</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL</td>
 
<td>SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL</td>
Line 33: Line 28:
 
<td>&#128178;1,335</td>
 
<td>&#128178;1,335</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>TEMPORARY FENCE -- INSTALL AND REMOVAL</td>
 
<td>TEMPORARY FENCE -- INSTALL AND REMOVAL</td>
Line 42: Line 35:
 
<td>&#128178;1,280</td>
 
<td>&#128178;1,280</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL</td>
 
<td>STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL</td>
Line 51: Line 42:
 
<td>&#128178;2,410</td>
 
<td>&#128178;2,410</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>EROSION CONTROL BLANKET</td>
 
<td>EROSION CONTROL BLANKET</td>
Line 60: Line 49:
 
<td>$1,696</td>
 
<td>$1,696</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL</td>
 
<td>STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL</td>
Line 69: Line 56:
 
<td>&#128178;774</td>
 
<td>&#128178;774</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>DUST CONTROL</td>
 
<td>DUST CONTROL</td>
Line 78: Line 63:
 
<td>&#128178;1,210</td>
 
<td>&#128178;1,210</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td colspan=4>Total Part 1 </td>
 
<td colspan=4>Total Part 1 </td>
 
<td>&#128178;32,045</td>
 
<td>&#128178;32,045</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<th colspan=5>Part 2 - Removals</th>
 
<th colspan=5>Part 2 - Removals</th>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 </td>
 
<td>REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 </td>
Line 100: Line 77:
 
<td>&#128178;1,072</td>
 
<td>&#128178;1,072</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>Total Part 2 </td>
 
<td colspan=4>Total Part 2 </td>
 
<td>&#128178;1,072</td>
 
<td>&#128178;1,072</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<th colspan=5>Part 3 - Grading</th>
 
<th colspan=5>Part 3 - Grading</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE</td>
 
<td>COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE</td>
Line 120: Line 91:
 
<td>$9</td>
 
<td>$9</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>REMOVAL OF EXCAVATED MATERIAL</td>
 
<td>REMOVAL OF EXCAVATED MATERIAL</td>
Line 130: Line 98:
 
<td>$13,890</td>
 
<td>$13,890</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>AGGREGATE BACKFILL</td>
 
<td>AGGREGATE BACKFILL</td>
Line 140: Line 105:
 
<td>$41,369</td>
 
<td>$41,369</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>Total Part 3 </td>
 
<td colspan=4>Total Part 3 </td>
 
<td>&#128178;72,854</td>
 
<td>&#128178;72,854</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<th colspan=5>Part 4 – Underground Storage Tank Components</th>
 
<th colspan=5>Part 4 – Underground Storage Tank Components</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>RAINWATER HARVESTING TANK (120" DIA. X 50-FEET)</td>
 
<td>RAINWATER HARVESTING TANK (120" DIA. X 50-FEET)</td>
Line 160: Line 119:
 
<td>&#128178;232,917</td>
 
<td>&#128178;232,917</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>CONSTRUCT DRAINAGE STRUCTURE</td>
 
<td>CONSTRUCT DRAINAGE STRUCTURE</td>
Line 168: Line 126:
 
<td>&#128178;6,918</td>
 
<td>&#128178;6,918</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) </td>
 
<td>CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) </td>
Line 176: Line 133:
 
<td>&#128178;6,510</td>
 
<td>&#128178;6,510</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK)</td>
 
<td>CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK)</td>
Line 184: Line 140:
 
<td>&#128178;7,488</td>
 
<td>&#128178;7,488</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>INSTALL CASTING</td>
 
<td>INSTALL CASTING</td>
Line 192: Line 147:
 
<td>&#128178;7,326</td>
 
<td>&#128178;7,326</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>18" HDPE PIPE</td>
 
<td>18" HDPE PIPE</td>
Line 200: Line 154:
 
<td>&#128178;8,395</td>
 
<td>&#128178;8,395</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>SOIL DENSITY COMPACTION TESTING</td>
 
<td>SOIL DENSITY COMPACTION TESTING</td>
Line 208: Line 161:
 
<td>&#128178;5,160</td>
 
<td>&#128178;5,160</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>Total Part 4 </td>
 
<td colspan=4>Total Part 4 </td>
 
<td>&#128178;274,714</td>
 
<td>&#128178;274,714</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<th colspan=5>Part 5 – Site Restoration</th>
 
<th colspan=5>Part 5 – Site Restoration</th>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<td>RAPID STABILIZATION</td>
 
<td>RAPID STABILIZATION</td>
Line 229: Line 175:
 
<td>&#128178;1,333</td>
 
<td>&#128178;1,333</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>PERMANENT SEEDING</td>
 
<td>PERMANENT SEEDING</td>
Line 237: Line 182:
 
<td>&#128178;2,661</td>
 
<td>&#128178;2,661</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>TURF ESTABLISHMENT</td>
 
<td>TURF ESTABLISHMENT</td>
Line 245: Line 189:
 
<td>&#128178;2,500</td>
 
<td>&#128178;2,500</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td colspan=4>Total Part 5 </td>
 
<td colspan=4>Total Part 5 </td>
 
<td>&#128178;6,494</td>
 
<td>&#128178;6,494</td>
 
</tr>
 
</tr>
 
 
 
 
<tr>
 
<tr>
 
<th colspan=4>Total Bid</th>
 
<th colspan=4>Total Bid</th>
 
<th>&#128178;386,590</th>
 
<th>&#128178;386,590</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>PRICE PER TANK (3 – 29,000 gallon tanks)</td>
 
<td colspan=4>PRICE PER TANK (3 – 29,000 gallon tanks)</td>
 
<td>&#128178;129,060</td>
 
<td>&#128178;129,060</td>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td colspan=4>PRICE PER TANK PER YEAR OVER 25 YEAR</td>
 
<td colspan=4>PRICE PER TANK PER YEAR OVER 25 YEAR</td>
 
<td>&#128178;5,162</td>
 
<td>&#128178;5,162</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
<td colspan=4>PRICE PER GALLON</td>
+
<td colspan=4>PRICE PER GALLON (87,000 gallons)</td>
<td>&#128178;1.46</td>
+
<td>&#128178;4.44</td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=4>PRICE PER GALLON PER YEAR OVER 25 YEARS</td>
 
<td colspan=4>PRICE PER GALLON PER YEAR OVER 25 YEARS</td>
 
<td>&#128178;0.06</td>
 
<td>&#128178;0.06</td>
 
</tr>
 
</tr>
 
 
 
 
 
  
 
</table>
 
</table>
 
 
 
 
  
 
[[category:Table]]
 
[[category:Table]]

Revision as of 16:22, 24 August 2017

Contractor bid averages for installation of three 29,000 gallon underground storage tanks

Link to this table

BASE BID ITEM ESTIMATED QUANTITY UNIT UNIT PRICE AVERAGE TOTAL AVERAGE BID
Part 1 - General and Erosion Control
MOBILIZATION 1 LS 💲23,340 💲23,340
SEDIMENT CONTROL LOG -- INSTALL, MAINTENANCE AND REMOVAL 267 LF 💲5 💲1,335
TEMPORARY FENCE -- INSTALL AND REMOVAL 160 LF 💲8 💲1,280
STABILIZED CONSTRUCTION EXIT -- INSTALL, MAINTENANCE AND REMOVAL 1 LS 💲2,410 💲2,410
EROSION CONTROL BLANKET 424 SY $4 $1,696
STORM DRAIN INLET PROTECTION -- INSTALL, MAINTENANCE AND REMOVAL 2 EA 💲387 💲774
DUST CONTROL 10 HRS 💲121 💲1,210
Total Part 1 💲32,045
Part 2 - Removals
REMOVE EXISTING SEDIMENT CONTROL LOG OR SILT FENCE Total Part 2 268 LF 💲4 💲1,072
Total Part 2 💲1,072
Part 3 - Grading
COMMON EXCAVATION -- INCLUDES TANK TRENCH EXCAVATION AND FILL TO PROPOSED GRADE 1955 CY $9 $9
REMOVAL OF EXCAVATED MATERIAL 1389 CY $10 $13,890
AGGREGATE BACKFILL 1009 CY $41 $41,369
Total Part 3 💲72,854
Part 4 – Underground Storage Tank Components
RAINWATER HARVESTING TANK (120" DIA. X 50-FEET) 3 EA 💲77,639 💲232,917
CONSTRUCT DRAINAGE STRUCTURE 6 EA 💲1,153 💲6,918
CONCRETE, REINFORCED COLLAR (RISER MANHOLE CAP) 6 EA 💲1,085 💲6,510
CONCRETE, REINFORCED COLLAR (AT RISER CONNECTION TO TANK) 6 EA 💲1,248 💲7,488
INSTALL CASTING 6 EA 💲1,221 💲7,326
18" HDPE PIPE 115 LF 💲73 💲8,395
SOIL DENSITY COMPACTION TESTING 12 EA 💲430 💲5,160
Total Part 4 💲274,714
Part 5 – Site Restoration
RAPID STABILIZATION 0.42 AC 💲3,173 💲1,333
PERMANENT SEEDING 0.42 AC 💲6,336 💲2,661
TURF ESTABLISHMENT 1 EA 💲2,500 💲2,500
Total Part 5 💲6,494
Total Bid 💲386,590
PRICE PER TANK (3 – 29,000 gallon tanks) 💲129,060
PRICE PER TANK PER YEAR OVER 25 YEAR 💲5,162
PRICE PER GALLON (87,000 gallons) 💲4.44
PRICE PER GALLON PER YEAR OVER 25 YEARS 💲0.06