m
m
 
(One intermediate revision by the same user not shown)
Line 27: Line 27:
 
</table>
 
</table>
  
[[category:Table]]
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Erosion prevention]]
 +
</noinclude>

Latest revision as of 14:55, 24 July 2022

Excerpt from Table 2575-4 - Required Corrective Action
Link to this table

Item Corrective Action Required if: Corrective action
Mulch material, hydraulic erosion control products
  • Incorrect rate of application
  • Not uniformly placed
  • Rutting on slopes from equipment
  • Improper anchoring
  • Broken disks, wrong angle
  • Remulch to provide proper coverage
  • Adjust placement of mulch to provide uniform placement
  • Fix ruts, remulch and reseed
  • Re-anchor the mulch
  • Use equipment designed for anchoring

This page was last edited on 24 July 2022, at 14:55.