m |
m |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{alert|NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.|alert-danger}} | {{alert|NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.|alert-danger}} | ||
− | [[Category:CADD | + | [[Category:Level 3 - General information, reference, tables, images, and archives/Images/Schematic - CADD detail]] |
+ | [[Category:Level 3 - Best management practices/Specifications and details/Images and CADD]] |
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 14:03, 12 February 2014 | (130 KB) | Mtrojan (talk | contribs) |
You cannot overwrite this file.
The following 2 pages use this file:
This page was last edited on 19 December 2022, at 00:49.