− | {{alert|NOTE: In the diagram, construction sequence step 5 | + | {{alert|NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.|alert-danger}} |