|
|
Line 1: |
Line 1: |
| + | {{alert|NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.|alert-danger}} |
| | | |
− | | + | [[Category:CADD (detail) images]] |
− | {{alert|NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.|alert-danger}}
| |
Revision as of 20:12, 9 April 2020
Warning: NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Dimensions | User | Comment |
current | 14:03, 12 February 2014 | (130 KB) | Mtrojan (talk | contribs) | |
You cannot overwrite this file.