03_Bioinfiltration.pdf(file size: 130 KB, MIME type: application/pdf)

Warning: NOTE: In the diagram, construction sequence step 5 states a 1 foot minimum cover is needed if using the bioretention area as a temporary sediment basin. The Construction Stormwater General Permit states: It is REQUIRED that future bioretention locations not be used as temporary sedimentation basins unless 3 feet of cover is left in place during construction.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:03, 12 February 2014 (130 KB)Mtrojan (talk | contribs)