m
m
Line 15: Line 15:
 
<tr>
 
<tr>
 
<td>Pretreatment vegetated filter strip (VFS</td>
 
<td>Pretreatment vegetated filter strip (VFS</td>
<td>Construction sequence</td>
+
<td>[https://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-9.pdf Construction sequence]</td>
 
<td>Quarterly and after every 1 in storm event for first two years, then biannually [https://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-9.pdf]</td>
 
<td>Quarterly and after every 1 in storm event for first two years, then biannually [https://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-9.pdf]</td>
 
<td></td>
 
<td></td>
Line 25: Line 25:
 
<tr>
 
<tr>
 
<td>Level-Spreader - Vegetative Filter Strip System (LS-VFS)</td>
 
<td>Level-Spreader - Vegetative Filter Strip System (LS-VFS)</td>
<td>Construction notes</td>
+
<td>[https://ncdenr.s3.amazonaws.com/s3fs-public/Water%20Quality/Surface%20Water%20Protection/SPU/SPU%20-%20BMP%20Manual%20Documents/BMPMan-Ch08-20100309-DWQ-SPU.pdf Construction notes]</td>
 
<td>Quarterly and after every 1 in storm event for first two years, then biannually [https://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-9.pdf]</td>
 
<td>Quarterly and after every 1 in storm event for first two years, then biannually [https://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-9.pdf]</td>
 
<td></td>
 
<td></td>
Line 37: Line 37:
 
<td></td>
 
<td></td>
 
<td>Every 6 months for first year of operation, then site specific. Floatables, sediment, media, and drain down filter each need to be inspected [https://www.njstormwater.org/pdf/up_flo_maint.pdf]</td>
 
<td>Every 6 months for first year of operation, then site specific. Floatables, sediment, media, and drain down filter each need to be inspected [https://www.njstormwater.org/pdf/up_flo_maint.pdf]</td>
<td>Inspection and maintenance checklist</td>
+
<td>[https://www.njstormwater.org/pdf/up_flo_maint.pdf Inspection and maintenance checklist]</td>
 
<td></td>
 
<td></td>
 
<td>Sediment removal at least once per year or once sediment depth is 16 inches [https://www.njstormwater.org/pdf/up_flo_maint.pdf]</td>
 
<td>Sediment removal at least once per year or once sediment depth is 16 inches [https://www.njstormwater.org/pdf/up_flo_maint.pdf]</td>
Line 47: Line 47:
 
<td>One-person installation [https://cleanwayusa.com/installation]</td>
 
<td>One-person installation [https://cleanwayusa.com/installation]</td>
 
<td>Monthly [https://cleanwayusa.com/installation]</td>
 
<td>Monthly [https://cleanwayusa.com/installation]</td>
<td>Maintenance instructions</td>
+
<td>[https://cleanwayusa.com/installation Maintenance instructions]</td>
 
<td></td>
 
<td></td>
 
<td>When visual inspection or water sampling show degradation. MetalZorb is non-hazardous and does not require special waste handling [https://cleanwayusa.com/installation]</td>
 
<td>When visual inspection or water sampling show degradation. MetalZorb is non-hazardous and does not require special waste handling [https://cleanwayusa.com/installation]</td>
Line 65: Line 65:
 
<tr>
 
<tr>
 
<td>Filtration berm</td>
 
<td>Filtration berm</td>
<td>Construction sequence</td>
+
<td>[http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf Construction sequence]</td>
 
<td>After each rainfall [http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf]</td>
 
<td>After each rainfall [http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf]</td>
<td>Maintenance considerations</td>
+
<td>[http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf Maintenance considerations]</td>
 
<td></td>
 
<td></td>
 
<td>Routinely remove accumulated trash and debris [http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf]</td>
 
<td>Routinely remove accumulated trash and debris [http://www.stormwaterpa.org/assets/media/BMP_manual/chapter_6/Chapter_6-4-10.pdf]</td>
Line 75: Line 75:
 
<tr>
 
<tr>
 
<td>SiltSoxx R by Filtrexx</td>
 
<td>SiltSoxx R by Filtrexx</td>
<td>Installation instructions</td>
+
<td>[https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf Installation instructions]</td>
 
<td>Within 24 hours after rainfall event [https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf]</td>
 
<td>Within 24 hours after rainfall event [https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf]</td>
<td>Maintenance instructions</td>
+
<td>[https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf Maintenance instructions]</td>
 
<td></td>
 
<td></td>
 
<td>Sediment removal from upslope side when accumulation has reached ½ the effective height of the Soxx [https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf]</td>
 
<td>Sediment removal from upslope side when accumulation has reached ½ the effective height of the Soxx [https://www.filtrexx.com/application/files/1015/0186/8935/1.1_Filtrexx_Sediment_Control.pdf]</td>
Line 85: Line 85:
 
<tr>
 
<tr>
 
<td>StormExx</td>
 
<td>StormExx</td>
<td>Installation notes</td>
+
<td>[https://www.filtrexx.com/application/files/8315/2632/4158/Filtrexx_StormExx_CLEAN_Specification.pdf Installation notes]</td>
 
<td>Every 90 days, frequent drive through inspection during leaf-fall and after storm events [https://www.filtrexx.com/application/files/8315/2632/4158/Filtrexx_StormExx_CLEAN_Specification.pdf]</td>
 
<td>Every 90 days, frequent drive through inspection during leaf-fall and after storm events [https://www.filtrexx.com/application/files/8315/2632/4158/Filtrexx_StormExx_CLEAN_Specification.pdf]</td>
 
<td></td>
 
<td></td>

Revision as of 20:17, 3 June 2019

Filtration - installation and maintenance recommendations
Link to this table

Device Installation notes Frequency of inspections Maintenance checklist (link) Permitted on private land/ Maintenance agreement recommended Practices for minimizing sediment and trash buildup Practices for minimizing washout Cost considerations (equipment needed and man hours)
Pretreatment vegetated filter strip (VFS Construction sequence Quarterly and after every 1 in storm event for first two years, then biannually [1] Sediment removed at least biannually of when buildup exceeds 2 inches in depth [2] Appropriate vegetation and landscaping maintenance; See Appendix [3] Generally $100-$1400 per acre [4]
Level-Spreader - Vegetative Filter Strip System (LS-VFS) Construction notes Quarterly and after every 1 in storm event for first two years, then biannually [5] Sediment removed at least biannually of when buildup exceeds 2 inches in depth [6] Appropriate vegetation and landscaping maintenance; See Appendix [7] Generally $100-$1400 per acre [8]
Up-Flo Filter Every 6 months for first year of operation, then site specific. Floatables, sediment, media, and drain down filter each need to be inspected [9] Inspection and maintenance checklist Sediment removal at least once per year or once sediment depth is 16 inches [10] Routine maintenance for manhole unit takes about 1 hour [11]
Storm Clean One-person installation [12] Monthly [13] Maintenance instructions When visual inspection or water sampling show degradation. MetalZorb is non-hazardous and does not require special waste handling [14] Vactor truck or large shop vac; One person [15]
Gravel filtration After each rainfall Remove sediment from behind bag as needed
Filtration berm Construction sequence After each rainfall [16] Maintenance considerations Routinely remove accumulated trash and debris [17] Appropriate vegetation and landscaping maintenance (eg. mowing and level gradient restoration); See Appendix [18] Depends on height, length, width, and location of berm [19]
SiltSoxx R by Filtrexx Installation instructions Within 24 hours after rainfall event [20] Maintenance instructions Sediment removal from upslope side when accumulation has reached ½ the effective height of the Soxx [21]
StormExx Installation notes Every 90 days, frequent drive through inspection during leaf-fall and after storm events [22] Costs for one year of service and maintenance may be added to proposal [23] Quarterly general service, fall cleaning and cartridge replacement [24]