(4 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
===Guidance for completing the Annual Report form=== | ===Guidance for completing the Annual Report form=== | ||
#[[Download page with TMDL forms]] | #[[Download page with TMDL forms]] | ||
+ | #[https://app.sharebase.com/#/folder/37975/share/185-TTxu0Ww9u4UPSmPNf7orb4onwcc Link to many TMDL shapefiles] | ||
#[[Guidance for completing the TMDL reporting form]] | #[[Guidance for completing the TMDL reporting form]] | ||
##[[Quick Guide: BMP-Activities completed tab]] | ##[[Quick Guide: BMP-Activities completed tab]] | ||
Line 15: | Line 16: | ||
#[[FAQs on TMDL reporting form]] | #[[FAQs on TMDL reporting form]] | ||
#[[Baseline year]] | #[[Baseline year]] | ||
− | |||
− | |||
===Guidance for resources and tools used to complete the Annual Report form=== | ===Guidance for resources and tools used to complete the Annual Report form=== | ||
Line 36: | Line 35: | ||
#[[FAQs on TMDL reporting form]] | #[[FAQs on TMDL reporting form]] | ||
#[[Baseline year]] | #[[Baseline year]] | ||
− | #[ | + | #[https://app.sharebase.com/#/folder/37975/share/185-TTxu0Ww9u4UPSmPNf7orb4onwcc Link to many TMDL shapefiles] |
#Flow regime discussion | #Flow regime discussion | ||
Line 43: | Line 42: | ||
#[[Guidance and examples for using the MPCA Estimator]] | #[[Guidance and examples for using the MPCA Estimator]] | ||
##[[Quick Guide: MPCA Estimator tab]] | ##[[Quick Guide: MPCA Estimator tab]] | ||
+ | |||
+ | ==Related Pages== | ||
+ | *[[Overview of TMDLs]] | ||
+ | *[[Summary of TMDL requirements in stormwater permits]] | ||
+ | *[http://www.pca.state.mn.us/index.php/water/water-types-and-programs/minnesotas-impaired-waters-and-tmdls/minnesotas-impaired-waters-and-total-maximum-daily-loads-tmdls.html Minnesota's impaired waters and TMDLs] - homepage to find completed, draft and TMDLs underway | ||
+ | |||
+ | ==Guidance documents== | ||
+ | *[http://www.pca.state.mn.us/index.php/view-document.html?gid=19465 Addressing TMDL Requirements in MS4 General Permit Applications and Stormwater Pollution Prevention Program Documents] | ||
+ | *[http://www.pca.state.mn.us/index.php/view-document.html?gid=19456 List of approved TMDLs with MS4 Wasteload Allocations] | ||
+ | *[[Technical guidance used by MPCA to develop guidelines for setting TMDL WLAs for regulated stormwater]] | ||
+ | *[[Case studies for regulated stormwater issues]] | ||
+ | *[[Guidance on what discharges should be included in the TMDL wasteload allocation for MS4 stormwater]] | ||
+ | *[[Construction activity by county]] |
MS4 (Municipal Separate Storm Sewer System) permittees who have a U.S.EPA-approved total maximum daily load wasteload allocation (WLA) that they are not meeting must annually report on progress made toward achieving those WLAs. This is achieved by submitting an annual report on a Minnesota Pollution Control Agency (MPCA) form approved by the MPCA Commissioner. This page provides links to guidance on completing that form, including links to resources and tools used to complete the form.
NOTE: Permit requirements differ for Phase 2 MS4s and the two Phase 1 cities (St. Paul and Minneapolis), so the page is divided into separate sections based on those differing requirements.