==Pretreatment==
 
==Pretreatment==
The section on pretreatment will be updated. Anticipated completion summer 2016. To see the workplan, link here: [[file:pretreatment work plan.docx]]
+
A section on design, construction, and O&M guidelines for pretreatment vegetated filter strips will be updated. Anticipated completion end of 2016. To see the workplan, link here: [[file:Vegetated filter strip scope of work July 2016.docx]]
  
 
==Construction stormwater==
 
==Construction stormwater==

Revision as of 22:03, 28 July 2016

Timelines shown below are approximate. We update this page infrequently.

Road salt

In spring of 2016 we began updating information on road salt and stormwater management for road salt. This effort will continue through 2016. Link.

Infiltration

The section on infiltration basins and infiltration trenches will be updated. Anticipated completion summer 2016. To see the workplan, link here: File:Infiltration work plan.docx

Pretreatment

A section on design, construction, and O&M guidelines for pretreatment vegetated filter strips will be updated. Anticipated completion end of 2016. To see the workplan, link here: File:Vegetated filter strip scope of work July 2016.docx

Construction stormwater

A new section addressing construction stormwater will be developed. Anticipated completion summer 2016. To see the workplan, link here: File:Construction work plan.docx

Harvest and use

The section on harvest and reuse will be updated. Anticipated completion summer 2016. To see the workplan, link here: File:Harvest use work plan.docx

MIDS Calculator updates

The MIDS calculator is undergoing updates. To see the workplan, link here: File:Work plan MIDS calculator.docx