Green roof performance summary
Link to this table

Event Runoff Volume Performance Summary
Runoff Volume from Direct Watershed (ft3) 2,832
Runoff Volume from Upstream BMPs (ft3) 0
Retention Volume Provided by BMP (ft3) 2,734
Outflow Volume from BMP (ft3) 98
Percent Performance Goal Achieved (%) 97
Annual Performance Goal Summary
Volume Runoff from Direct Watershed (acre-ft.) 0.00
Runoff from Upstream BMPs (acre-ft.) 1.59
Retention Volume Provided by BMP (acre-ft.) 0.71
Outflow Volume from BMP (acre-ft.) 0.87
Percent Performance Goal Achieved (%) 45
Phosphorus (P) Particulate P from Watershed (lbs.) 0.72
Particulate P from Upstream BMPs (lbs.) 0
Particulate P Load Reduction (lbs.) 0
Particulate P Outflow 0.72
Total Percent Particulate P Reduction 0
Dissolved P from Watershed (lbs.) 0.58
Dissolved P from Upstream BMPs (lbs.) 0
Dissolved P Load Reduction (lbs.) 0
Dissolved P Outflow (lbs.) 0.58
Total Percent Dissolved P Reduction (%) 0
Total Suspended Solids (TSS) TSS from Watershed (lbs.) 236
TSS from Upstream BMPs (lbs.) 0
TSS Load Reduction (lbs.) 226
TSS Outflow (lbs.) 10
Total Percent TSS Reduction (%) 96