Link to this [[Infiltration Trench - Construction inspection checklist|table]]<br>
 
Link to this [[Infiltration Trench - Construction inspection checklist|table]]<br>
 
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]].
 
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]].
 +
 
<table class="sortable">
 
<table class="sortable">
 
<tr>
 
<tr>
Line 34: Line 35:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Runoff diverted</td>
 
<td>Runoff diverted</td>
Line 68: Line 68:
 
<th colspan=3>2. Excavation</th>
 
<th colspan=3>2. Excavation</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Size and location per plans</td>
 
<td>Size and location per plans</td>
Line 95: Line 93:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>3. Filter Fabric Placement</th>
 
<th colspan=3>3. Filter Fabric Placement</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Fabric per specifications</td>
 
<td>Fabric per specifications</td>
Line 110: Line 106:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Placed per plan location</td>
 
<td>Placed per plan location</td>
Line 116: Line 111:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>4. Aggregate Material</th>
 
<th colspan=3>4. Aggregate Material</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Size as specified</td>
 
<td>Size as specified</td>
Line 139: Line 132:
 
<th colspan=3>5. Observation Well</th>
 
<th colspan=3>5. Observation Well</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Pipe size per plans</td>
 
<td>Pipe size per plans</td>
Line 163: Line 155:
 
<th colspan=3>6. Vegetation</th>
 
<th colspan=3>6. Vegetation</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Complies with planting specifications</td>
 
<td>Complies with planting specifications</td>
Line 183: Line 173:
 
<th colspan=3>7. Final Inspection</th>
 
<th colspan=3>7. Final Inspection</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Dimensions per plans</td>
 
<td>Dimensions per plans</td>
Line 211: Line 200:
 
<tr>
 
<tr>
 
<td colspan=3>Comments:
 
<td colspan=3>Comments:
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Actions to be taken:
 
<td colspan=3>Actions to be taken:
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
 
</table>
 
</table>
  
<noinclude>[[category:table]]</noinclude>
+
<noinclude>
<noinclude>[[category:Checklist]]</noinclude>
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]]
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Infiltration basin, trench, underground infiltration]]
 +
</noinclude>

Latest revision as of 17:30, 4 August 2022

Infiltration Trench and infiltration basin - Construction inspection checklists.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Filter Fabric Placement
Fabric per specifications
Fabric per specifications
Placed per plan location
4. Aggregate Material
Size as specified
Clean / washed material
Placed properly
5. Observation Well
Pipe size per plans
Under-drain installed per plans
Inlet installed per plans
Pre-treatment devices installed per plans
6. Vegetation
Complies with planting specifications
Topsoil complies with composition and placement in specifications
Permanent erosion control measures in place
7. Final Inspection
Dimensions per plans
Check dams operational
Inlet / outlet operational
Effective stand of vegetation and stabilization
Contributing watershed stabilized before flow is routed to the facility
Comments:
Actions to be taken: