<font size=3>'''Infiltration Trench and infiltration basin - Construction inspection checklists'''.</font size><br>
 +
Link to this [[Infiltration Trench - Construction inspection checklist|table]]<br>
 +
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]].
  
 
<center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br>
 
Link to this [[Infiltration Trench - Construction inspection checklist|table]]</center>
 
 
<table class="sortable">
 
<table class="sortable">
 
<tr>
 
<tr>
Line 11: Line 11:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td colspan=3Site Status:</td>
+
<td colspan=3>Site Status:</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 32: Line 32:
 
<tr>
 
<tr>
 
<td>Pre-construction meeting</td>
 
<td>Pre-construction meeting</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Runoff diverted</td>
 
<td>Runoff diverted</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Soil permeability verified</td>
 
<td>Soil permeability verified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Groundwater / bedrock verified</td>
 
<td>Groundwater / bedrock verified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Project benchmark established</td>
 
<td>Project benchmark established</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Facility location staked out</td>
 
<td>Facility location staked out</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Temporary erosion and sediment control established</td>
 
<td>Temporary erosion and sediment control established</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<th colspan=3>2. Excavation</th>
 
<th colspan=3>2. Excavation</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Size and location per plans</td>
 
<td>Size and location per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Side slopes stable</td>
 
<td>Side slopes stable</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Depth adjusted to soil layer with specified soil type and permeability</td>
 
<td>Depth adjusted to soil layer with specified soil type and permeability</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
 
<td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
 
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>3. Filter Fabric Placement</th>
 
<th colspan=3>3. Filter Fabric Placement</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Fabric per specifications</td>
 
<td>Fabric per specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Fabric per specifications</td>
 
<td>Fabric per specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Placed per plan location</td>
 
<td>Placed per plan location</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>4. Aggregate Material</th>
 
<th colspan=3>4. Aggregate Material</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Size as specified</td>
 
<td>Size as specified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Clean / washed material</td>
 
<td>Clean / washed material</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Placed properly</td>
 
<td>Placed properly</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<th colspan=3>5. Observation Well</th>
 
<th colspan=3>5. Observation Well</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Pipe size per plans</td>
 
<td>Pipe size per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Under-drain installed per plans</td>
 
<td>Under-drain installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Inlet installed per plans</td>
 
<td>Inlet installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Pre-treatment devices installed per plans</td>
 
<td>Pre-treatment devices installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<th colspan=3>6. Vegetation</th>
 
<th colspan=3>6. Vegetation</th>
 
</tr>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td>Complies with planting specifications</td>
 
<td>Complies with planting specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Topsoil complies with composition and placement in specifications</td>
 
<td>Topsoil complies with composition and placement in specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Permanent erosion control measures in place</td>
 
<td>Permanent erosion control measures in place</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<th colspan=3>7. Final Inspection</th>
 
<th colspan=3>7. Final Inspection</th>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td>Dimensions per plans</td>
 
<td>Dimensions per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Check dams operational</td>
 
<td>Check dams operational</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Inlet / outlet operational</td>
 
<td>Inlet / outlet operational</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Effective stand of vegetation and stabilization</td>
 
<td>Effective stand of vegetation and stabilization</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Contributing watershed stabilized before flow is routed to the facility</td>
 
<td>Contributing watershed stabilized before flow is routed to the facility</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Comments:
 
<td colspan=3>Comments:
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Actions to be taken:
 
<td colspan=3>Actions to be taken:
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 +
</table>
  
</table>
+
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]]
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Infiltration basin, trench, underground infiltration]]
 +
</noinclude>

Latest revision as of 17:30, 4 August 2022

Infiltration Trench and infiltration basin - Construction inspection checklists.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Filter Fabric Placement
Fabric per specifications
Fabric per specifications
Placed per plan location
4. Aggregate Material
Size as specified
Clean / washed material
Placed properly
5. Observation Well
Pipe size per plans
Under-drain installed per plans
Inlet installed per plans
Pre-treatment devices installed per plans
6. Vegetation
Complies with planting specifications
Topsoil complies with composition and placement in specifications
Permanent erosion control measures in place
7. Final Inspection
Dimensions per plans
Check dams operational
Inlet / outlet operational
Effective stand of vegetation and stabilization
Contributing watershed stabilized before flow is routed to the facility
Comments:
Actions to be taken:

This page was last edited on 4 August 2022, at 17:30.