<center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br>
 
<center><font size=3>'''Infiltration Trench - Construction inspection checklists'''.</font size><br>
 
Link to this [[Infiltration Trench - Construction inspection checklist|table]]</center>
 
Link to this [[Infiltration Trench - Construction inspection checklist|table]]</center>
Line 11: Line 11:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td colspan=3Site Status:</td>
+
<td colspan=3>Site Status:</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 32: Line 32:
 
<tr>
 
<tr>
 
<td>Pre-construction meeting</td>
 
<td>Pre-construction meeting</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Runoff diverted</td>
 
<td>Runoff diverted</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Soil permeability verified</td>
 
<td>Soil permeability verified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Groundwater / bedrock verified</td>
 
<td>Groundwater / bedrock verified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Project benchmark established</td>
 
<td>Project benchmark established</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Facility location staked out</td>
 
<td>Facility location staked out</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Temporary erosion and sediment control established</td>
 
<td>Temporary erosion and sediment control established</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 73: Line 73:
 
<tr>
 
<tr>
 
<td>Size and location per plans</td>
 
<td>Size and location per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Side slopes stable</td>
 
<td>Side slopes stable</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Depth adjusted to soil layer with specified soil type and permeability</td>
 
<td>Depth adjusted to soil layer with specified soil type and permeability</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
 
<td>Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
 
<td>Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 103: Line 103:
 
<tr>
 
<tr>
 
<td>Fabric per specifications</td>
 
<td>Fabric per specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Fabric per specifications</td>
 
<td>Fabric per specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
 
<tr>
 
<tr>
 
<td>Placed per plan location</td>
 
<td>Placed per plan location</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
  
Line 124: Line 124:
 
<tr>
 
<tr>
 
<td>Size as specified</td>
 
<td>Size as specified</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Clean / washed material</td>
 
<td>Clean / washed material</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Placed properly</td>
 
<td>Placed properly</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 143: Line 143:
 
<tr>
 
<tr>
 
<td>Pipe size per plans</td>
 
<td>Pipe size per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Under-drain installed per plans</td>
 
<td>Under-drain installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Inlet installed per plans</td>
 
<td>Inlet installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Pre-treatment devices installed per plans</td>
 
<td>Pre-treatment devices installed per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 168: Line 168:
 
<tr>
 
<tr>
 
<td>Complies with planting specifications</td>
 
<td>Complies with planting specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Topsoil complies with composition and placement in specifications</td>
 
<td>Topsoil complies with composition and placement in specifications</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Permanent erosion control measures in place</td>
 
<td>Permanent erosion control measures in place</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
Line 187: Line 187:
 
<tr>
 
<tr>
 
<td>Dimensions per plans</td>
 
<td>Dimensions per plans</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Check dams operational</td>
 
<td>Check dams operational</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Inlet / outlet operational</td>
 
<td>Inlet / outlet operational</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Effective stand of vegetation and stabilization</td>
 
<td>Effective stand of vegetation and stabilization</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td>Contributing watershed stabilized before flow is routed to the facility</td>
 
<td>Contributing watershed stabilized before flow is routed to the facility</td>
<td>   </td>
+
<td> </td>
<td>   </td>
+
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>

Revision as of 20:10, 7 February 2013


Infiltration Trench - Construction inspection checklists.
Link to this table
Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Filter Fabric Placement
Fabric per specifications
Fabric per specifications
Placed per plan location
4. Aggregate Material
Size as specified
Clean / washed material
Placed properly
5. Observation Well
Pipe size per plans
Under-drain installed per plans
Inlet installed per plans
Pre-treatment devices installed per plans
6. Vegetation
Complies with planting specifications
Topsoil complies with composition and placement in specifications
Permanent erosion control measures in place
7. Final Inspection
Dimensions per plans
Check dams operational
Inlet / outlet operational
Effective stand of vegetation and stabilization
Contributing watershed stabilized before flow is routed to the facility
Comments:



Actions to be taken: