<font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
 +
Link to this [[Infiltration basin - system construction inspection checklist|table]]<br>
 +
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]].
  
<center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
 
Link to this [[Media filter system - construction inspection checklist|table]]</center>
 
 
<table class="sortable">
 
<table class="sortable">
 
<tr>
 
<tr>
Line 52: Line 53:
 
<td>Project benchmark established</td>
 
<td>Project benchmark established</td>
 
<td> </td>
 
<td> </td>
 
+
<td> </td>
 +
</tr>
 
<tr>
 
<tr>
 
<td>Facility location staked out</td>
 
<td>Facility location staked out</td>
Line 92: Line 94:
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<th colspan=3>3. Filter Fabric Placement</th>
+
<th colspan=3>3. Embankment</th>
</tr>
 
<tr>
 
<td>Fabric per specificationss</td>
 
<td> </td>
 
<td> </td>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Placed per plan location</td>
+
<td>Anti-seep collar or filter diaphragm per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
</tr>
 
 
<tr>
 
<th colspan=3>4. Aggregate Material</th>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Size as specified</td>
+
<td>Fill material per specifications</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Clean / washed material</td>
+
<th colspan=3>4. Final Excavation</th>
<td> </td>
 
<td> </td>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Placed properly</td>
+
<td>Drainage area stabilized</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
</tr>
 
 
<tr>
 
<th colspan=3>5. Observation Well</th>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Pipe size per plans</td>
+
<td>Sediment removed from facility</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Under-drain installed per plans</td>
+
<td>Basin floor tilled</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Inlet installed per plans</td>
+
<td>Facility stabilized</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Pre-treatment devices installed per plans</td>
+
<td>Removable cap / footplate per plans</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
</tr>
 
 
<tr>
 
<th colspan=3>6. Vegetation</th>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Complies with planting specifications</td>
+
<td>Initial depth = feet</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Topsoil complies with composition and placement in specifications</td>
+
<th colspan=3>5. Final Inspection</th>
<td> </td>
 
<td> </td>
 
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Permanent erosion control measures in place</td>
+
<td>Pre-treatment facility operational</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<th colspan=3>7. Final Inspection</th>
+
<td>Contributing watershed stabilized prior to flow diversion</td>
</tr>
 
<tr>
 
<td>Dimensions per plans</td>
 
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Check dams operational</td>
+
<td>Inlet and outlet operational</td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
<tr>
 
<td>Inlet / outlet operational</td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
<tr>
 
<td>Effective stand of vegetation and stabilization</td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
<tr>
 
<td>Contributing watershed stabilized before flow is routed to the facility</td>
 
<td> </td>
 
<td> </td>
 
</tr>
 
 
 
<tr>
 
<tr>
 
<td colspan=3>Comments:
 
<td colspan=3>Comments:
 
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Actions to be taken:
 
<td colspan=3>Actions to be taken:
 
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 +
</table>
  
</table>
+
<noinclude>
[[category:table]]
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]]
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Infiltration basin, trench, underground infiltration]]
 +
</noinclude>

Latest revision as of 17:29, 4 August 2022

Infiltration basin - system construction inspection checklist.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Embankment
Anti-seep collar or filter diaphragm per plans
Fill material per specifications
4. Final Excavation
Drainage area stabilized
Sediment removed from facility
Basin floor tilled
Facility stabilized
Removable cap / footplate per plans
Initial depth = feet
5. Final Inspection
Pre-treatment facility operational
Contributing watershed stabilized prior to flow diversion
Inlet and outlet operational
Comments:
Actions to be taken: