(Created page with " <center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br> Link to this [[Media filter system - construction inspection checkl...")
 
m
 
(14 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
<font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
 +
Link to this [[Infiltration basin - system construction inspection checklist|table]]<br>
 +
To access an Excel version of form (for field use), click [[ Forms (including field inspection forms)|here]].
  
 
<center><font size=3>'''Infiltration basin - system construction inspection checklist'''.</font size><br>
 
Link to this [[Media filter system - construction inspection checklist|table]]</center>
 
 
<table class="sortable">
 
<table class="sortable">
 
<tr>
 
<tr>
Line 53: Line 53:
 
<td>Project benchmark established</td>
 
<td>Project benchmark established</td>
 
<td> </td>
 
<td> </td>
 
+
<td> </td>
 +
</tr>
 
<tr>
 
<tr>
 
<td>Facility location staked out</td>
 
<td>Facility location staked out</td>
Line 105: Line 106:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>4. Final Excavation</th>
 
<th colspan=3>4. Final Excavation</th>
Line 111: Line 111:
 
<tr>
 
<tr>
 
<td>Drainage area stabilized</td>
 
<td>Drainage area stabilized</td>
<td> </td>
 
<td> </td>
 
</tr>
 
<tr>
 
<td>Filter material per specification</td>
 
 
<td> </td>
 
<td> </td>
 
<td> </td>
 
<td> </td>
Line 144: Line 139:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<th colspan=3>5. Final Inspection</th>
 
<th colspan=3>5. Final Inspection</th>
Line 163: Line 157:
 
<td> </td>
 
<td> </td>
 
</tr>
 
</tr>
 
 
<tr>
 
<tr>
 
<td colspan=3>Comments:
 
<td colspan=3>Comments:
 
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
 
<td colspan=3>Actions to be taken:
 
<td colspan=3>Actions to be taken:
 
 
 
 
 
 
</td>
 
</td>
 
</tr>
 
</tr>
 +
</table>
  
 
+
<noinclude>
 
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Checklist]]
</table>
+
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Infiltration basin, trench, underground infiltration]]
[[category:table]]
+
</noinclude>

Latest revision as of 17:29, 4 August 2022

Infiltration basin - system construction inspection checklist.
Link to this table
To access an Excel version of form (for field use), click here.

Project:
Location:
Site Status:
Date:
Time:
Inspector:
Construction Sequence Satisfactory / Unsatisfactory Comments
1. Pre-Construction
Pre-construction meeting
Runoff diverted
Soil permeability verified
Groundwater / bedrock verified
Project benchmark established
Facility location staked out
Temporary erosion and sediment control established
2. Excavation
Size and location per plans
Side slopes stable
Depth adjusted to soil layer with specified soil type and permeability
Sub-soil not adjacent to excavation area and stabilized with vegetation and/ or silt fence
Stockpile location not adjacent to excavation area and stabilized with vegetation and/ or silt fence
3. Embankment
Anti-seep collar or filter diaphragm per plans
Fill material per specifications
4. Final Excavation
Drainage area stabilized
Sediment removed from facility
Basin floor tilled
Facility stabilized
Removable cap / footplate per plans
Initial depth = feet
5. Final Inspection
Pre-treatment facility operational
Contributing watershed stabilized prior to flow diversion
Inlet and outlet operational
Comments:
Actions to be taken: