Levels of assessment for stormwater best management practices (stormwater control measures)
Link to this table

Level Title Objectives Relative Typical elapsed time Advantages Disadvantages
1 Visual Inspection Determine if stormwater BMP is malfunctioning 1 1 day Quick, inexpensive Limited knowledge gained
2 Capacity testing Determine infiltration or sedimentation capacity and rates 10 1 week Less expensive, no equipment left in field Limited to infiltration and sedimentation capacity/rates, uncertainties can be substantial
3 Simulated runoff testing Determine infiltration rates, capacity, and pollutant removal performance 10-100 1 week to 1 month Controlled experiments, more accurate with fewer tests required for statistical significance as compared to monitoring, no equipment left in field Cannot be used without sufficient water supply, limited scope
4 Monitoring Determine infiltration rates, capacity, and pollutant removal performance 400 14 months Most comprehensive. Assess stormwater BMP within watershed without modeling Uncertainty in results due to lack of control and number of variables, equipment left in field

This page was last edited on 27 December 2022, at 15:18.