Line 181: Line 181:
 
<sup>3</sup> “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.<br>
 
<sup>3</sup> “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.<br>
 
<sup>4</sup> TPP and TPD reduction variable based on design input parameters.</font size>
 
<sup>4</sup> TPP and TPD reduction variable based on design input parameters.</font size>
 +
 +
<noinclude>
 +
[[Category:Level 3 - General information, reference, tables, images, and archives/Tables/Models, modeling, model applications and examples]]
 +
</noinclude>

Latest revision as of 14:43, 4 August 2022

MIDS Calculator BMP summary
Link to this table

BMP type1 Requires input dimensions? Volume reduction (%) TSS reduction (%) Total particulate phosphorus (TPP) reduction (%) Total dissolved phosphorus (TDP) reduction
Green roof Yes 45 96 0 0
Bioretention Basin (w/o underdrain) Yes Lookup table2
Bioretention Basin (w/ underdrain) Yes Lookup table2 60 0-804 0-604
Infiltration basin/ Infiltration Trench Yes Lookup table2
Underground Infiltration Yes Lookup table2
Permeable pavement Yes Lookup table2 74 82 0
Tree Trench (w/o underdrain) Yes Lookup table2
Tree Trench (w/ underdrain) Yes Lookup table2 68 0-804 0-604
Swale Side Slope Yes Lookup table2
Swale Main Channel (w/o underdrain) Yes Lookup table2 68 73 0
Swale Main Channel (w/underdrain) Yes Lookup table2
Wet swale No 68 0-454 0-604
Harvest and Re-Use Cistern Yes Calculated3
Imperviousness Disconnection Yes Lookup table2 68 0 0
Sand Filter (Not-Enhanced) No 85 85 0
Sand Filter (Enhanced) No 85 85 40
Constructed Wetland No 68 55 0
Stormwater Pond (Level 1) No 60 62 0
Stormwater Pond (Level 2) No 84 84 8
Stormwater Pond (Level 3) No 90 90 23
Other No User-defined

1Based on Version 3.0 of the MIDS Calculator
2 "Lookup Table" indicates removal calculated from MIDS P8 modeling lookup tables.
3 “Calculated" indicates volume reduction is calculated based on user inputs for cistern reuse / irrigation scheduling.
4 TPP and TPD reduction variable based on design input parameters.