QUESTION:

Is Flexible Treatment Option (FTO) 2 feasible?


Yes

No

PREVIOUS QUESTION and ANSWER:

  • Is Flexible Treatment Option (FTO) 1 feasible?
    • Answer: No

Flexible Treatment Option 2 (FTO #2)

Applicant attempts to comply with the following conditions:

  1. Achieve volume reduction to the maximum extent practicable (as determined by the Local Authority), and
  2. Remove 60 percent of the annual total phosphorus load, and
  3. options considered and presented shall examine the merits of relocating project elements to address varying soil conditions and other constraints across the site.


Links