m
m
 
Line 13: Line 13:
  
 
[[MIDS design sequence flow chart - Box 26|No]]
 
[[MIDS design sequence flow chart - Box 26|No]]
 +
 +
If you are unsure, we recommend you review the guidance for karst in this manual. To retain your place in this flowchart, either open the [http://stormwater.pca.state.mn.us/index.php/Karst karst guidance] page in a new tab (right click on the link and select ''Open Link in New Tab''), use the back arrow after visiting the karst guidance page, or use the Breadcrumbs at the top of the page.
 
</font size>
 
</font size>
  

Latest revision as of 16:12, 14 July 2015

Information: NOTE: you have arrived at a step in the Design Sequence flow chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Is karst present on the site?

Yes

No

If you are unsure, we recommend you review the guidance for karst in this manual. To retain your place in this flowchart, either open the karst guidance page in a new tab (right click on the link and select Open Link in New Tab), use the back arrow after visiting the karst guidance page, or use the Breadcrumbs at the top of the page.

PREVIOUS QUESTION and ANSWER:

  • Are there existing or proposed structures or infrastructure that make the performance goal not feasible?
    • Answer: No

or

  • Is BMP relocation feasible?
    • Answer: Yes


Links

This page was last edited on 14 July 2015, at 16:12.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */