Information: NOTE: you have arrived at a step in the Design Sequence flow chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Conduct a detailed site investigation of shallow groundwater or shallow bedrock

Next question

PREVIOUS QUESTION and ANSWER:

  • Is shallow groundwater or shallow bedrock present on site?
    • Answer: Yes


Links

Return to Flexible treatment options Return to Design sequence flow chart Return to List of flow chart questions

This page was last edited on 6 February 2014, at 18:39.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */