m
m
 
Line 15: Line 15:
 
</font size>
 
</font size>
  
==PREVIOUS QUESTION and ANSWER:==
+
==PREVIOUS STEP:==
 
<font size=4>
 
<font size=4>
*
+
You were asked to conduct a detailed site investigation of [[Shallow groundwater|shallow groundwater]] or [[Shallow soils and shallow depth to bedrock#Investigation for shallow bedrock areas|shallow bedrock]]
**Answer:
 
 
</font size>
 
</font size>
  
  
===Return to [[Flexible treatment options]]===
+
===Links===
 
+
*Return to [[Flexible treatment options]]
===Return to [[Design sequence flow chart]]===
+
*Return to [[Design sequence flow chart]]
 
+
*Return to [[List of flow chart questions]]
===Return to [[List of flow chart questions]]===
 
  
 
[[category:MIDS flowchart]]
 
[[category:MIDS flowchart]]

Latest revision as of 18:41, 6 February 2014

Information: NOTE: you have arrived at a step in the Design Sequence Flow chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Is there more than 3 feet of soil depth from bottom of BMP to bedrock or groundwater (more than 10 feet is preferred)?

Yes

No

PREVIOUS STEP:

You were asked to conduct a detailed site investigation of shallow groundwater or shallow bedrock


Links

This page was last edited on 6 February 2014, at 18:41.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */