Information: NOTE: you have arrived at a step in the Design Sequence flow Chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

Raise BMP enough to ensure 3 feet (preferably 10 feet) of soil between bottom of BMP and top of bedrock and groundwater

Proceed to Next Step

PREVIOUS QUESTION and ANSWER

  • Can the BMP be raised?
    • Answer: Yes


Links

This page was last edited on 6 February 2014, at 18:47.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */