QUESTION:

Are there very low infiltrating soils (less than 0.2 inches per hour) on site?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Is there presence of contaminated soils, contaminated groundwater, or hotspot runoff on the site?
    • Answer: No

or

  • Can hotspot or contamination be isolated or remediated?
    • Answer: Yes