Information: NOTE: you have arrived at a step in the Design Sequence Flow Chart. This flow chart is used to determine your performance goal. For more information see this link
image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Is BMP relocation onsite to a higher-infiltrating location feasible?
    • Answer: No