Information: NOTE: you have arrived at a step in the Design Sequence flow chart. This flow chart is used to determine your performance goal. For more information see this link


image of Minimal Impact Design Standards logo
For more information on the Design Sequence Flow Chart see the following:
*Flexible treatment options
*MIDS flow chart
*List of steps in flow chart

QUESTION:

Are there very high infiltrating soils (more than 8 inches per hour) on site?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Are there very low infiltrating soils (less than 0.2 inches per hour) present on site?
    • Answer: No

or

  • Is BMP relocation onsite to a higher-infiltrating location feasible?
    • Answer: Yes

or

  • Can BMP be sized to drain dry within 48 hours (24 hours in locations that are tributary to trout streams)?
    • Answer: Yes


Links

This page was last edited on 10 February 2014, at 20:39.

Template:Footer

/* Manually replaced by abbott Aug 6 '21 */