QUESTION:

Can subgrade be modified to slow the rate of infiltration to less than 8 inches per hour?

Yes

No

PREVIOUS QUESTION and ANSWER:

  • Is BMP relocation onsite to a lower-infiltrating location feasible?
    • Answer: No